Font Size: a A A

Design And Application Research For Integration Project Of Marketing And Distribution

Posted on:2017-03-12Degree:MasterType:Thesis
Country:ChinaCandidate:W ZhangFull Text:PDF
GTID:2322330512978968Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
Nowadays,the State Grid Corporation enters full construction to improve power management of the camp for distribution transformer station area.Integration of marketing and distribution is realized by acquisition system of power consumer electricity information.This paper presents a power management system of the camp for distribution transformer station area with integrated marketing and distribution.System architecture and solution of distribution transformer station is studied based on current situation and typical application at home and abroad,including technical structure,architecture solution of marketing and distribution integration and so on.Then based on the example of the actual construction in an Inner Mongolia rural,a power management system of the camp for distribution transformer station area with integrated marketing and distribution is proposed from the introduction of wireless meter reading system architecture,hardware and software,as well as on-site installation and operation technology.At last,the article analyzes the effect after the application of power management system and achieves some useful management measures.
Keywords/Search Tags:Power system, integration project of marketing and distribution, architecture design, wireless meter reading, station area of energy management
PDF Full Text Request
Related items