Font Size: a A A

Design And Implementation Of An Airline It Asset Lifecycle, Operation And Maintenance Management System

Posted on:2015-01-05Degree:MasterType:Thesis
Country:ChinaCandidate:X Z FangFull Text:PDF
GTID:2308330473953028Subject:Software engineering
Abstract/Summary:PDF Full Text Request
The main purpose of this article is to complete the design and implementation of asset lifecycle and operation and maintenance management system to improve asset management and operation and maintenance management of an airline, solve various management challenges currently facing.Gap this thesis in the first chapter from the current level of asset management companies and state-owned enterprise asset management requirements that exist, indicating that the system developed by the seriousness and urgency, and detailed description of the current enterprise asset management and part of the operation and maintenance management loopholes exist. Concise Introduction ITIL management ideas and methods, according to the ITIL philosophy expounded goals asset lifecycle and operation and maintenance management system. Meanwhile on the market applicability of existing software to make conclusions, indicating the presence of an airline gap with some of the conditions and requirements, reflecting the need for self-developed. Finally, in order to make the system better able to meet the compatibility, ease of system extensions and applications can be quickly developed and implemented as soon as possible, this article uses a ASP.NET language design, SQL language design and object-oriented development techniques to complete the system.First, the thesis of the system in-depth analysis of a wide range of needs, and further in-depth analysis of the current situation and the operation and maintenance management asset management companies, a list of the main goals of the system needs to be done, according to management thinking combing ITIL Asset Management and operation and maintenance management of approximately workflow. And decomposition in the role of the internal system user groups in the product-oriented. Requirements definition and further customer service hotline on, MCC maintenance control center, quality control personnel, on-site troubleshooting and asset management staff carried out a detailed needs analysis, through this screening and research articles to finalize the various roles in the article’s as a basis for the design and implementation of systems of different modules.Then, this article describes the development environment of the system and presents the overall interface requirements and quality requirements. Under limited circumstances, this article has the design and implementation of the system when using a usability strategy, expansion strategy, taking strategies and compromise strategy. Next, after the realization by the interpretation of the various modules of the system process design and interface, the system generates a detailed analysis shows that the finalization of the design and implementation of the system.Finally, the article launched a functional test of the system, the test results obtained by the system is fully in line with the company’s needs. Ultimately the success of the system started running within the company, and has been widely praised across the company, but because of the short development time, lack of preparation, the system still need to be resolved in some places, along with the progress of science and the use of in-depth system this system will also be increasingly improved further committed to the company’s development...
Keywords/Search Tags:asset life cycle, operation and maintenance, management system
PDF Full Text Request
Related items