Font Size: a A A

Design And Implementation Of Power Enterprise Employee Records And Statistical Analysis And Management System

Posted on:2016-05-12Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhuFull Text:PDF
GTID:2308330473456666Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the continuous reform of the electric power enterprise, and as the unit at the bottom of the electric power enterprises, power shift has been Department of a major reform of the electric power enterprise, completes the construction of team and group is an important content of the management of power enterprises. With the modern management concept and knowledge of the staff, with the modern management tool training team members, this is the new situation to improve the construction of the team and the weight of the top.Therefore, in nation building smart grid at the same time, to accelerate the construction of electric power enterprise team is imminent. By using computer software technology combined with the problems in the management, construction of a management team for the standardization system and information sharing platform can rapidly improve the overall level of power enterprise team, let business leaders to quickly grasp the team dynamic, team members can quickly understand each place team advanced and successful experience, which can quickly enhance the professional skills of team.In this paper, the use of J2 EE technology construction team management system based on B / S mode, through a combination of database technology and combined with the electric power bureau at present of team and group management requirements for the development of a system of a suit of team management actual demand. Through electric power bureau, power supply bureau, team layer facing the team’s team dynamic information can be shared. The computer technology realize the team plans and the performance evaluation of the online examination and management, in order to achieve the best team assessment standards of, achieve the benign development of the team competition. In short, through this system, the power team from the traditional management mode to the use of modern management mode, and through the network of team and team of successful experience and daily office to achieve network.In this paper, analysis and summary and to the domestic and foreign present situation and the trend of development on the problems existing in the current electric power company team management were analyzed in this paper and the research contents are summarized; secondly, techniques used in the system of the business functional requirements of the system analysis and detailed description; thirdly, the function design and the database design of the system carried out in detail; thirdly, realize the important function of the system was described in detail, and lists the interface and key code. Finally, on the system test method and the test process and test results are described. In this paper, the needs, design, implementation and testing of the team and team system in accordance with the software engineering ideas, mainly in accordance with the waterfall model to carry out the relevant work. After some demonstration and concrete realization, the team and team system achieved the expected target, and it runs normal.
Keywords/Search Tags:Power team, database technology, J2EE technology, performance assessment
PDF Full Text Request
Related items