Font Size: a A A

Design And Implementation Of Performance Assessment System For Anshan Sports Bureau

Posted on:2015-09-17Degree:MasterType:Thesis
Country:ChinaCandidate:S BaiFull Text:PDF
GTID:2298330467980560Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the development of information construction for every department, we build the information construction specifically for performance assessment management in order to improve the efficiency of the performance assessment in Anshan Sports Bureau, and to achieve the performance assessment standardized and institutionalized, scientific management. By building the performance assessment system for Anshan Sports Bureau we can solve difficult management and the weakness supervision of the assessment, and we can make sure that the assessment plays an important role in improving the Anshan Sports Bureau construction work.This system is a typical B/S structure system which is developed by Java and using the frame-technique of Struts, Spring and Hibernate on the Artery control platform with Sql Server2008database to store the background data. The system is to optimize the reorganization of managerial structure and work flow for the performance assessment in Anshan Sports Bureau utilizing the convenience of network. It realizes the online assessment and check the results and records, to make it convenient for the users who resides in different places. By analyzing the large amounts of data, the system can help users make a rational and effective assessment management ordinance.This paper is designed with the development technique of web pages to progress requirement analysis, preliminary-design, detail-design, coding and other parts with the theory of software development. Firstly, the paper introduced the background of the performance assessment and the knowledge of E-government, and then described the goal and significance of the system. Secondly, the paper introduced some technologies related to the system, and pointed the advantages and disadvantages of the technologies, and described the causes to use the technologies. At last, a detailed presentation was made to introduce the development process.
Keywords/Search Tags:Work management, Performance assessment system, Artery control platform
PDF Full Text Request
Related items