Font Size: a A A

Correction Pharmaceutical Group Project Management Office Study

Posted on:2015-11-30Degree:MasterType:Thesis
Country:ChinaCandidate:Q ZhengFull Text:PDF
GTID:2272330503479554Subject:Project management
Abstract/Summary:PDF Full Text Request
Progress of the project management office is revised Pharmaceutical Group, project mana gement is an important project is the guarantee period, reduce costs, improve project quality a ssurance. It is a prerequisite for the success of the project and to play a benefit.The progress o f modern engineering project management labor consumption, costs, resources, and integrate physical and other factors, compared with the traditional period schedule control, it is more co mprehensive and objective reflection of the project implementation.The progress of the three objectives of quality engineering management, project investment and progress of the project progress of the project management division. They are in the actual project management, and plays an important role.In the actual work closely premise of this article to correct Pharmaceu tical Group office building project, for example, by analyzing its presence in the schedule ma nagement issues, form their own opinions. Thesis consists of six chapters. The introduction of the first chapter, describes the research methods, the purpose and significance, background.A nd inadequate innovation Subjects herein. Project Schedule Management as part of the basic t heory of the second chapter introduces the basic content of the project schedule management,and the principles and methods. The third chapter analyzes the status quo and revised Pharma ceutical Group office building projects.This paper introduces the basic overview of the project,analyzes the revised Pharmaceutical Group Office Project Management problems and causes and the status quo, and explores the factors that affect the project schedule management.The f ourth chapter for the development of revised Pharmaceutical Group office project schedule pr ograms. Demonstration schedule management revised Pharmaceutical Group office project sc hedule from a management perspective, the main purpose of the project including the work sc hedule prepared by the method of preparation and so specific in its scope.The fifth chapter is r evised Pharmaceutical Group office project schedule control management. Mainly expounds t he purpose, basic procedures, methods, project progress control, dynamic control implementat ion steps. Finally, an amendment Pharmaceutical Group office optimization project specific s afeguards. The sixth chapter is the conclusion.Significance of the development knot revised P harmaceutical Group, Project Management Office, and put forward the further development p rospects.The theory and practice of project management combined with project schedule, in-d epth analysis and comprehensive summary of Project Management during lessons in favor of other amendments Pharmaceutical Group Project Management Office Reference Reference.
Keywords/Search Tags:Office buildings, Engineering project, Progress control, Progress plan, Research
PDF Full Text Request
Related items