Font Size: a A A

The Application Of Information Technology In Construction Project Management

Posted on:2016-01-24Degree:MasterType:Thesis
Country:ChinaCandidate:H J ChengFull Text:PDF
GTID:2272330467998089Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, due to China’s economy and the needs of social development, theconstruction industry to create the output value occupies in our country the proportionof GDP has been greatly. Although, the construction industry with the developmentof reform and opening-up has also made great progress, but in most people’s minds,still can not change the closed, extensive, insecurity, not standardized impression.With the advent of the information age, a large number of data through theInternet in the way of people’s life and production plays an important role in. Manyindustry due to the application of information technology, improved in many aspects,has had the earth shaking change. Has not found the industry that field, due to theapplication of information technology hindered the development of the industry orsector so that information is undoubtedly an advanced mode of production. Thedevelopment history of the human society can prove that an advanced productionmode to replace the backward mode of production is the inevitable development ofhuman society. The traditional construction industry informatization to transform theway, is the inevitable trend of social development.At present, the construction industry is what kind of status quo, which problemsneed to be solved, how to solve, how to use the information solution, and the effectafter the solution is the focus of this paper.The construction industry with other industries, there are many problems to besolved. From the construction industry, safety, quality, saving, efficient, innovation ofthe five core objectives, the development process of safety and quality in theconstruction industry for many years, has been a certain degree of development andimprove, in accordance with China’s current industry standards, has to meet the basicrequirements, or that, of these two little aspects of the transformation of space and. Saving, high efficiency, the three aspects of innovation, can transform a space, atransformation of its informatization way, the effect will be more obvious.In the past, we in the drawing or computer time reflected in the design of abuilding, often is the use of sign language only professionals can understand. Becauseof the environment and the restriction of the way, had used sign language can greatlysave the cost and improve the efficiency of. But with the development of the times,improve the level of technology, which is the heavenly way of expression, has beenfar can’t meet the social development and the development of the constructionindustry needs. BIM design can not only make buildings displayed on the computerwith the3D way, can also use the plane mode, the position of the buildingprofessionals need or construction drawings in symbolic language way to print out, sothat the design intention become very clear, can be avoided in the design of all kindsof contradictions, can make the calculation of the volume of works more simple anddirect, non professionals can make more from the points involved in the design, butalso provide a good platform for project management in the future.The application of BIM design information technology in construction projectmanagement, we can put the labor, materials, machinery and tools and so on turnovermaterials on this platform for the management and use, enabling us to achieveimprovement in all aspects of safety management, schedule management, qualitymanagement, technical management, plan management, financial management and soon, also for the construction industry in the next step may provide more scientificmanagement.The core of the project management technology of construction is theconstruction process, only the construction process improvement, can really improveconstruction project management level, and the construction process on the basis ofinformation based on the improvement of the construction project management, moreshould be the direction of. At present, the construction industry is the mainconstruction technique of cast-in-place concrete technology, with the factory level,and the community of energy-saving and environmental protection and efficientrequirements, make use of assembled concrete technology is inevitable. Finally, this paper carries on the analysis through the profit and loss balancetheory, mathematical statistics theory, may be of information technology in theconstruction project management and the inevitable.
Keywords/Search Tags:Information technology, BIM design, project management informationization, prefabricated concrete
PDF Full Text Request
Related items