Font Size: a A A

Based On The Theory Of Real Estate Project Management Core Resource Allocation Research

Posted on:2013-08-17Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2252330425972225Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
As enterprises have more and more items to choose from, resource issue has become a core issue in multi-project management. The enterprise often encountered resource conflicts in the development process, due to the constraints of the resources, enterprises not only need to analyze the choice of alternative projects,but also need to establish effective resource allocation plan for the implemented project. Finally realizes the integrated benefit maximization.These two aspects of the problem for project selection and core resource configuration under resource constraints proposed framework of multi-project management theory-based real estate enterprise resource optimization. The framework is divided into two main parts:The first part is integrate the enterprise resource capabilities and strategic into project selection, building a scientific project preferred model, and then select the most favorable to the implementation of the project; The second part is to establish a resource allocation model for the project, used to achieve dynamic optimal allocation of core resources. The paper established resource optimization model which maximize achieve enterprise efficiency of enterprise resource constraints will have a certain practical significance.This article treats the multi-project management theory as a starting point and treats the resource management to achieve the overall objective of the optimization as a criterion. In order to build a scientific project selection model and core resource allocation model, finally, to provide a further platform for practice. The content of this article include three parts:The first part (the first chapter) is the part of the problem put forward. This part mainly including on the research background and significance, introduces the related research and presents the research train of thought;The second part (the second, three, four and five chapters) is the theoretical part. This part treats the multi project resource management as the research object, then analysis the influence factors of enterprise multi project resource management and optimization. The paper uses the Vague set multi objective assessment method to build the project priority evaluation model and uses the critical chain method to establish the resource dynamic allocation model, to build a multi project resource management theory system;The third part (the sixth chapter) is the practice of application part. The selection of real estate development enterprise for example, application of the multi project resource management system which second part has established, analyzes the project selection and resource configuration then proves the feasibility of the model.No established perfect theory of multi-project resource management system at home and abroad, and there are a number of shortcomings in various existing methods. This study is one of the related fields expand. The purpose is to provide the multi project enterprise a new solution for how to select an item and the efficient allocation of resources.
Keywords/Search Tags:Multi-project Management, Multi-project Resource Management, Multi-project Priority, Resource Constraints
PDF Full Text Request
Related items