Font Size: a A A

Design And Implementation Of The Oilfield Downhole Operation Approval System

Posted on:2013-05-01Degree:MasterType:Thesis
Country:ChinaCandidate:X M ZhangFull Text:PDF
GTID:2248330395474288Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Because the liaohe oil field for its design scheme in the homework ShenQian workrequired is increasing day by day, make not only ShenQian management work iscomplicated, and put forward higher request: which asks work more and morecomprehensive, advanced and efficient. Based on the above demand, the developmentof the "oil field underground work design online examination and approval system". Itwill make management standardization. This topic is the "oil field underground workdesign online examination and approval system" the design, realization anddevelopment process will be divided into four stages: the system requirement analysis,system design stage of the overall stage, system design stage operation of the system,detailed and testing phase, realize the oilfields underground work design onlineexamination and approval system.Oil field is the use of the examination and approval system working undergroundMyeclipse integrated development environment, use JAVA development language toOracle and I for database, with the aid of Rational Rose visualized modeling tools,based on the J2EE framework of the realization of the B/S system. In technology,probes into the examination and approval system working underground oil field of workprinciple, analyses its total business processes and procedures. In design andimplementation, the system is divided into four modules, underground work designmodule, design audit modules, the design scheme file module, the system Settingsmodule.This paper expounds in detail the oil underground work for examination andapproval to the whole process of management system, and designed the security of thesystem and the strategy to write the server application, and its operation page basic tomeet the requirements of the customers, achieve the maximum design goal.
Keywords/Search Tags:B/S, J2EE, Underground work design for examination and approval
PDF Full Text Request
Related items