Jilin Communications Polytechnic New Campus Construction Cost Control Plan

Posted on:2013-04-01Degree:MasterType:Thesis
Country:ChinaCandidate:X YiFull Text:PDF
GTID:2247330371979861Subject:Project management
Abstract/Summary:PDF Full Text Request
Be obvious to people, China’s higher education is experiencing a hitherto unknownperiod of rapid development, more and more colleges and universities through thealteration of old campus, construction of the new campus and other ways to expand thesize of our school, improve school facilities, resulting in the students can take advantage ofcompetition. The construction of the new campus on one hand can enhance theschool-running idea, improve the quality of education, however, many colleges anduniversities in the new campus construction process due to the prophase planning does notreach the designated position, blind and fast and large, resulting in construction costseverely exceed the standard, so that schools with high debt, which for the long-termdevelopment of a school it is very adverse. Therefore, how to locate the futuredevelopment of the new campus, the scientific and reasonable the new campusconstruction cost budget, to ensure the construction quality at the same time the maximumcontrol construction cost has become the key to construction of new campus. This article isbased on this background, unifies the Jilin traffic construction of new campus of CareerAcademy ’s actual situation, to a more reasonable control new campus construction cost areanalyzed and discussed, with period for Jilin traffic Career Academy and all the othercollege new campus construction provides a reference. The main research content of thisthesis is divided into the following sections.First, the contrast overseas in new campusconstruction cost control features for our new campus construction cost controlcharacteristics were described, and the analysis of the new campus construction costcontrol significance.In second, focuses on the analysis of the construction project costcontrol of the basic theory and method of construction project investment, including theconcept, the principle and method of cost control.In third, the old campus of CareerAcademy from Jilin traffic, new campus basic situation is analyzed, and the new campusconstruction cost control in the course of the analysis of existing problems, to discuss thenew campus construction the necessity of cost control.Fourth, focus on the construction ofnew campus of Career Academy Jilin traffic in different stage of cost control plan analysisand setting, this several stages including decision-making phase, design phase, invitepublic bidding stage, signing a contract and construction and acceptance stage.In fifth, thepart of Jilin traffic Career Academy new campus construction cost control plan undertakesan analysis, emphasize at this stage of the progress circumstance of the project and theproblems needing attention are discussed.Through the research, the paper draws thefollowing conclusions.First, new campus construction, the feasibility study stage and thedesign stage is the control of the construction cost is the most important period, in the twostage, through the joint efforts of all aspects, scientific and reasonable to the new campusplanning and design, can be later for bidding and construction phase to give correctguidance, for the entire campus total investment control has important significance.Second,the bidding stage is the whole process of construction of new campus of determining reasonable cost and the strength of the construction team of key process. The purpose is tobe able to invite public bidding from numerous tender units among the most reasonabledesign, and the construction units in the quality of the corresponding examination. In thispaper, through the analysis of the Jilin Communications Polytechnic in the bidding processof practice experience, put forward to organize various departments in the college wereinvestigated the method of scoring, choose the strength of strong, trustworthy with goodconstruction method as an alternative tender, in the new campus construction projectbidding practice obtained good results. While the employment of experts, and also summedup in practice. On this basis, also expounded on the new campus construction process ofpreventing colluding and lopsided quote method, for the construction of the new campus ofthe tender to provide maneuverability strong project invite public bidding method.In third,want to be in the process of the contract better control of engineering cost in the contract issigned, you should put the lawful sex of the contract, payment terms, scope and cognizancemethod claims as stated in contract executive process, so there would be no big mistakes.Because of the new campus construction for colleges and universities is a hithertounknown large-scale investment projects, the lack of experience is the greatest weakness,so a perfect contract is a new campus construction cost control in the first task, also be thekey.In fourth, construction and settlement stage of the preparation of all stages ofimplementation, is the real results in the formation of new campus construction process.This phase of cost control is in strict accordance with the contract and bidding documentsand various regulations on it. Because as long as you follow the rules, all the increase incost approach will not be implemented.
Keywords/Search Tags:colleges and universities, new campus, cost control, Jilin Communications Polytechnic
PDF Full Text Request
Related items