Font Size: a A A

Research For Management Information System Construction Of Secondary Water Supply Pumping Station Of Changchun Water(Group) Co., Ltd

Posted on:2012-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:H XuFull Text:PDF
GTID:2218330368479683Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Changchun City's the second water supply layout confusing and poorly managed. A considerable part of the money supply facilities for a long time without maintenance, management, secondary water supply facilities and frequent overflow pipe leakage; while water pollution is very serious. Part of the water supply tank (pool) no cover, no lock and no management, long-term lack of cleaning, disinfection, water pipes and valves are improperly connected, resulting in non-potable water into drinking water pipes, causing water pollution. Second, blind construction of secondary water supply facilities, lack of unified planning, the distribution of pumping stations are too scattered, uneven commitment to supply the load, resulting in costly and is not conducive to manage the situation. Poor management due to the secondary water supply facilities, run, run, drip, drain very serious problem, and finally, the phenomenon of water pollution is also a prominent contradictions. No part of the tank without cap lock without special management, long-term without disinfection, water tank valves are improperly connected, resulting in the return to drinking non-potable water pipes, causing water pollution; after another because there is no precise estimates, blindly increasing reservoir capacity, resulting in stagnant water in the tank for too long, resulting in a secondary water pollution.In fact, the existing secondary water supply more than 300 property units, without a unified management, fragmentation, it can be said that the presence of these root causes are factors leading to its poor management. To solve these problems, we must build a standard secondary water supply pumping station management information system, which requires not only capital investment for hardware facilities improvement is more important is to establish an effective management information system, the establishment of sales charge management system, urgent need to dispatch center of the city water-supply systems for unified monitoring and scheduling. And growing for the future of the total water supply network scheduling system to provide a solid platform. Sales charge management system in the original are already familiar with using the software billing software based on the latest version of the business to replace the charge management system, and increased bank charges networking capabilities, financial capabilities of modern mobile phone banking and so on. Cost is not much human and material resources in the premise, so that software features more perfect, has a higher technological content and better stability for the company and provide a modern platform.Feasibility studies have shown that the secondary water supply pumping station Changchun Water Group information management system implementation of the project conditions have been met, based on the original system equipment, technical support through a collaborative unit to create a new sound management information system to produce water to water the whole process of the main line to secondary line of business management modernization, the integration of information technology in business applications, the implementation of the system of information management solutions in the construction of the project, the full use of geographic information systems (GIS) technology , computer technology, WebGis technology, communication technology, database technology, network technology, the latest results, close the water supply production operations with business processes, an integrated management model for water craft, water scheduling, pipeline GIS, business fees, customer services and engineering management, the establishment of integrated enterprise information technology platform, a unified data management, sharing and mining, and ultimately for society, for leadership, decision-oriented integrated service system. Specifically intended to solve the water supply enterprise information integrated scheduling, billing system and database connectivity technologies and WEB publishing technology, information management, network technology, a variety of means of communication with the communication network technology, data acquisition and data transmission technology and video security monitoring system technology . Successful completion of the hardware based on the construction of secondary water supply pumping station in Changchun Water Group management information systems and data collection, information processing and scheduling, video surveillance and integrated database of information management and dissemination of information the four major system functions, specifically relying on joint implementation of cooperative units.Changchun Water Supply to receive the second renovation project scheduling and network monitoring and telecommunications regulatory system, is set to receive the Changchun City, the second water supply network renovation project scheduling and communications regulations into one of the network communication scheduling system.System development based mainly on water supply, gas supply, heat supply, environmental protection and other industry characteristics, combined with the characteristics of the industry itself, around the industry in production, service, management and other needs, developed a comprehensive integrated information management system, and This system solves the Changchun Water Group of secondary water supply pumping station management information system of the four system functions. Specifically through the aid of advanced computer network technology, various industry applications SCAD scheduling system, large screen display system, automation control systems, operating fees management system, remote automatic meter reading system and other subsystems together, each subsystem integrated service platform enables data sharing, and each subsystem can also run independently, can provide a complete solution for the industry.The implementation of the project for the promotion of water supply schedule automatic monitoring of corporate networks have an important role in promoting water science and technology, promote the development of the industry are of great significance.The research project can make all software developers must recognize that the system has the versatility and importance of data sharing, will drive the office automation system, business billing system, GIS system, pipe network modeling systems, rapid application, thus promoting the software industry the development of ideas from the previous customized freed from the perspective of business needs of each system architecture, enhanced data can be shared. Promotion of the project, not only create economic benefits for Changchun, Changchun City, the information can also be expanded construction.
Keywords/Search Tags:Secondary water supply, pumping station management, management information systems, information technology
PDF Full Text Request
Related items