| Beijing Association for Science and Technology undertake large amounts offinancial science popularizing project every year, therefore the request for thesystematic, specialization and informatization of the scientific project managementtend to be more urgent. BAST hope that, with the construction of this project, they canrealize the management of science popularizing project after its applying, utilizingand concluding, which will make the information shared and accelerate theinformation exchanging within symposiums organ, subordinate institution, districtsand counties' associations in science and technology, by developing a specifiedplatform for the management of the science popularizing project and the funds. Thus,it will enable the examination and approve of the science popularizing project becomemore scientific and informatization, and reduce the workload and complexity of themanagement of the science popularizing funds.The research and the realizing of the Financial Management System perfectlymeets the need of BAST for standardization, normalization, unification of financialmanagement. By following the J2EE standard, and using MVC design pattern andSSH strut. The technology of Struts, JSP and AJAX was mainly used on thepresentation layer, while the business layer utilized the Spring, EJB methods, and theHibernate was applied in the data persistence layer. The chief function of this systemare the pre-final accounts management of project funding, the calculation of fundusing, the integration of Gold Abacus Financial software, the funding report of eachunit, the automatic statistics of data gathered by each unit.The design and the realizing of the system combine physical demand of BASTwith the implementation of technology. Analyzing the business requirement andoverall requirement of the system, the researchers designed the strut of the system.Then, starting from the each unit, they analyzed the relation of each systems whichnavigates for the development direction of the design and the realizing of this system.The analysis and research of this subject, in the current stage and later project ofinformatization of implementation of reference, at the same time, make the whole castinformation personnel in the system design and implementation of information system,how to carry on the demand analysis, structure design and how to realize how toprovide some guidance. |