Font Size: a A A

Sichuan Telecom Tent Eai / Bpm A Process Design

Posted on:2008-12-05Degree:MasterType:Thesis
Country:ChinaCandidate:X K ChenFull Text:PDF
GTID:2208360215950165Subject:Software engineering
Abstract/Summary:PDF Full Text Request
EAI(enterprise application integration) is integrated one kind of method and technology applying the isomerism that the scheme builds owing to various be unlike platform , with be unlike. EAI passes building-up bottom structure , comes to contact system, application , data source traversing entire enterprise isomerism etc. , accomplishes need sharing and exchanging a data seamlessly between internal ERP , CRM , SCM , data base , data storehouse, and the other important inside system in enterprise. The union resolving a scheme is in have had EAI , enterprise to be able to apply enterprise core right away and new Internet together.EAI (enterprise application integration) the advancement, software, the standard and the hardware unites, realizes the seamless integration between two or the more enterprises system, causes them to like a whole to be same. Although EAI frequently displays for to a commercial entity (for example a company) the information system carries on the service application integration, but when carries on the commercial transaction between many enterprises system time, EAI also displays for the different company entity between the enterprise system integration, for example B2B electronic commerce.The core business being Sichuan telecommunication company props up system , tent system accepts and hears with providing an order form , allocation opens , resource and labor Shan manage , core business such as collecting an intermediary agent , counting account affairs , outside system-consuming interface props up a function synthetically, the city company provides synthetical business together by the fact that technological process managing (BPM) and applying the integrated platform highway (EAI) to fuse every subsystem organically, to whole province everywhere propping up platform .Need and essentials design the main body of a book has been introduced mainly in synthetical Sichuan Province tent system owing to striding over system business circumstances, technological process designing unified EAI/BPM first order, the data, service handling , realizing one by one systematically the business technological process being completed across system enjoys. ODS , 10000 number , resource system wait to each system , including counting a fee , doing business, serve platform , data mapping and changing , serving invoking , the data synchronism and so on by the fact that BPM designs that different business technological process satisfies system by the fact that unified , simple entrance switches in one-level technological process of EAI/BPM's.
Keywords/Search Tags:Enterprise Application Integration, Integration Business, Support System Business Process, Management Data Mapping and transformation, Data synchronism
PDF Full Text Request
Related items