Font Size: a A A

Based On JBPM Workflow Electricity Fixed Assets Management System Design And Implementation

Posted on:2008-09-10Degree:MasterType:Thesis
Country:ChinaCandidate:S H ZhangFull Text:PDF
GTID:2208360212499976Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In order to realize business process automation, workflow technology is used as a key technology in enterprise business process modeling, simulation, optimization, management and integration. The research and application of workflow technology have great significance to enterprises. With the increasing globalization of market competition, enterprises must be able to reform their business processes quickly, so their workflow has received wide attention and study. However, the current workflow technology is far from mature. Especially there are many drawbacks about interoperation in the collaborations among heterogeneous enterprises. The emergence and development of Web services solves these drawbacks, so the workflow technology of JBPM (Java Business Process Management) based on the Web services can make up the deficiency of the current workflow technology.At first ,the article introduces the technology of workflows detailed , including the concept of workflow , the reference model of workflow as well as the development and the product of the workflow technical. In this foundation, analysis the JBPM workflow technology, introduce the JBPM system frame and using method.Next, this article through concrete description of the realistic situation of electric power profession fixed asset management , takes demand analysis , and carries on the system design ,uses the standard J2EE , takes component-based and object-based development methods as the design principle, finally uses the MVC pattern to design the system and using Struts ,Hibernate frame to carry on the concrete realization with JBPM frame ,the JBPM system frame is the core of this set of fixed asset management system, and overall system flows management work all will give JBPM to manage.The method of using this workflow platform is described in detail by a workflow case. It fully demonstrates the practicality of this workflow platform.Finally, function and performance of the workflow platform are generally tested. The test results of performance are seriously analyzed. The tests indicate that this workflow platform completely satisfies users'design requirements.This system realizes manual operations transforms to the computer information, the network working patterns in electric power fixed asset management, in this way ,we can achieve the strengthened management, reduce the laborintensity and the office expense, enhance the office efficiency.
Keywords/Search Tags:Workflow Management System, JBPM, Web services, Fixed asset management
PDF Full Text Request
Related items