Font Size: a A A

Workflow Engine Based Fixed Asset Management System Design And Implementation

Posted on:2014-05-07Degree:MasterType:Thesis
Country:ChinaCandidate:S B BaiFull Text:PDF
GTID:2268330425467860Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Banan district of Chongqing, the IRS is the accounting of the corporate assets inthe past has been to follow the traditional manual accounting, existing enterprise assetmanagement efforts not enough to make an inventory of instruments lack. On the onehand, enterprise asset investment growing; the other hand, because they can noteffectively revitalize and use, but also lead to idleness and lack of cost pressuresincrease, the waste of resources, profits year by year. In recent years, as China,people, work and pipe assets "of the three organic unity, the integration of externalsupervision of the assets of regulatory agencies in the assets run in-house monitoringregulatory approach. Upgrade assets to encourage mode, you become a top priority.Banan district of Chongqing, the IRS uses computer technology to strengthen andimprove its asset management, which have great significance for improving theutilization of its assets in good order to achieve greater effectiveness. Specifically thefollowing four points:1. Can be integrated physical and financial systems to achieve consistent debitcard, data sharing and information synchronization;2. To optimize business processes, so that the enterprise fixed assets managementefficiency;3. With the help of this system, enterprise real-time statistical data, thusfacilitating managers to achieve dynamic control of corporate fixed assets, andassessment to quantify;4. allows corporate assets, financial management, integration and informationtechnology.First consider the access control problems, in order to ensure that the office staffhas different access permissions, and it must meet the characteristics of enterprises andinstitutions frequently mobilize, and conducted in-depth study and research oninformation systems at the present stage of access control technology. System designprocess, using a role-based access control, and combined with the traditionaldiscretionary access control and mandatory access control technology, do so notonly to ensure the rational management of the permissions, but also to meet theenterprises andunits of flexible features of distribution of competences; fixed assets acceptance, recipients of fixed assets,fixed assets, change, maintenance of fixedassets and retirement of fixed assets and other systems; the entire system to the B/Sstructure mode,using the J2EE,AJAX and database technology for development.The system has been developed to test is completed, running in good condition.
Keywords/Search Tags:asset management system, the UML, the J2EE, the JDBC
PDF Full Text Request
Related items