Font Size: a A A

Research And Analysis On County - Level Policy Subsidy Project Management System Of Small And Medium - Sized Enterprises In Jinjiang Economic And Trade Bureau

Posted on:2016-09-12Degree:MasterType:Thesis
Country:ChinaCandidate:J X DingFull Text:PDF
GTID:2208330470456365Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Jinjiang City Economic and Trade Bureau County policy of small and medium-sized enterprises (SMEs) grant project management system research background is introduced in this paper. And now the government work in computer and manual review of the run in period, still mainly to artificial audit mainly, Jinjiang City Economic and Trade Bureau of small and medium-sized enterprises County policy subsidy project management system, the purpose of the study is to develop computer audit project and design the system. The principle and method of software engineering, in business analysis, using activity diagram describes the business process of the original manual review of the project; and the use of activity diagram of the original business process optimization, analysis of the system of the business process. In the functional analysis of case analysis and use case description, clear the system function, the use case description using use case diagram of the system of the business and tables to describe each use case, detailing the process of each case; the package diagram of the business of the expression of the relationship between packets of data structure, the overall function of the system is given in this paper package and function package diagram, including project reporting sub package diagram. In data analysis, the need to deal with the data of the functions of the system are analyzed, which lists the various business interface class, control class and the entity class, and gives the interface class, control class, entity class diagram, respectively, a detailed list describes the class of each entity. At the end of this paper summarizes the research and analysis of the work done, and the further work is prospected.
Keywords/Search Tags:Small and medium-sized enterprises, policy assistance projectmanagement, information system, Requirement modeling
PDF Full Text Request
Related items