Font Size: a A A

Engineering, Quality Control And Its Information Systems Research

Posted on:2003-07-02Degree:MasterType:Thesis
Country:ChinaCandidate:Y Q LiuFull Text:PDF
GTID:2192360065960044Subject:Water Resources and Hydropower Engineering
Abstract/Summary:PDF Full Text Request
Quality is the core content of what the engineer must control in Water and Hydroelectric Projects. Due to the characteristics of itself, the assignment of quality-control in Water and Hydroelectric Projects is complex and heavy. In this dissertation, with big or medium-sized projects of Water and Hydroelectric Engineering, detailed study had been made in quality control as well as its information system.Firstly, the characteristics of management and quality control of Water and Hydroelectric Projects and the current situation in China of the quality control information system are studied and summarized.Secondly, the construction stage of Water and Hydroelectric Projects is divided into three parts as beforehand phase, middle period and afterwards phase. The concrete contents of the influence complications in beforehand phase and the content and modus of quality control in middle period are brought forward. The control flow of influence complications in quality control from engineer is pointed out.Thirdly,according to contrast and study of articles about quality control in " Conditions Of Contract For Works Of Water and Hydroelectric Projects Construction " and " Conditions Of Contract For Works Of Civil Construction " in FIDIC, the differences and similarities are demonstrated, and the suggestions on modifications about " Conditions Of Contract For Works Of Water and Hydroelectric Projects Construction " in operation are made.Fourthly, countering engineer's main concrete operation during construction, evaluating standard of construction precepts are lodged and mathematics-former of blur-general judging theory is established. The feasibility and rationality of bringing blur-general judgement to bear in appraising construction precepts is proved by living example.Finally, through systems analysis and systems design of the quality control information systems in Water and Hydroelectric Projects, the logic model is established and the component of the module and the function of each module are also put forward.Textual results are practical and operability and consultative to those engineers whom engaged in quality control of Water and Hydroelectric Projects. They also have definite reference value in revising the " Conditions Of Contract For Works Of Water and Hydroelectric Projects Construction " in operation. The information systems of quality control based on the engineer of Water and Hydroelectric Projects in this dissertation can be the exploitation foundation of quality control information systems about Water and Hydroelectric Projects.
Keywords/Search Tags:water and hydroelectric projects, quality control, stage of construction, conditions of contract for works, information system.
PDF Full Text Request
Related items