Font Size: a A A

The Planning And Risk Management Of SHLR At Ningxia Telecom Reforming Project

Posted on:2008-11-14Degree:MasterType:Thesis
Country:ChinaCandidate:Q SongFull Text:PDF
GTID:2189360308979091Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In the past years, the development of PSTN voice service has gradually slowed down with more and more mark share assigned to mobile voice service, VOIP service, and instant messaging. It is inevitable that the ARPU value is dropped down step by step. It is time to carry on accuracy operation in PSTN. To provide personalized services over the existing traditional PSTN network becomes more and more difficult. And it is unworkable to solve it thoroughly only by simple upgrade and transformation. It presses for the whole network structure transition and transformation increasable.The paper begins with the background and the significance of event that Ningxia Telecom telephone network is being reformed(smp:SHLR reforming) at Ningxia Telecom and explains its characteristic and difficulties in management and at last follows the analyses based on the theory of project management. Then the program planning and risk management of this reform project are offered, followed with the discussion of its implement. Besides, the necessities and the significance on project planning and risk management are elaborated when having big and complex net construction. The thesis put forward telecommunication fixed network intelligence in Ningxia to turn the organization structure design of reform the item,responsibility allotment matrix and work structure decomposition, usage network plan the technique drew up the item implement a plan the project and item to plan the progress management project, make use of risk control the theories and method aim at to meet in the item implement of risk control the problem put forward the item risk to identify,valuation with reply,control project, tallied up the main risk of this item a control measure.This text still technically for new lead go into carry on summary with the construction management, to item implement in of the experience and shortage carried on a thinking, for telecommunication limited company in Ningxia is in the follow-up new technique,new the network led to provide item construction into the construction,the item manage of experience, is item of smooth implement with attained expectation purpose to provide experience and draw lessons from.The paper,at last, summarizes the introduction of new technology and its management. The creative treatments are given in responsive to the specific problem in implement.
Keywords/Search Tags:Planning management, risk management, reforming project, program planning and implement
PDF Full Text Request
Related items