The engineering design stage occupies a prominent position in the process of the engineering's construction. Fundamental, the plan of a design infects the difficulty and the period of the engineering's construction. It's one of the central tasks of engineering design and construction that managing to engineering design effectively attain to schedule to smoothly be targeted in the whole engineering construction stage.As a rising application discipline which is combination of modern project technology, management theory and project construction practice, Project Management is widely used in developed industrial countries. In fact, managing to engineering design effectively is very well at improvement of quality of design, the ensuring engineering's time limit and reducing cost of engineering. Manage of schedule and cost is an important task during manage of item. During the design stage, using the theory of schedule plan and schedule control can direct schedule of the design and ensure completion of design in time. So manage of schedule plan and cost control is very important.Based on related management knowledge, taking the linfen-hejin transmission line's prospecting and design as object, the thesis expatiates the application of theory, process and means of Manage of schedule and cost in construction practice.The text begins with introduce of prophase of manage of schedule and cost linfen-hejin transmission line's prospecting and design include progress plan and control, together with project framework, cooperation and quality. Then, the text illustrates establishing schedule plan , schedule control ,cost plan, cost control. Finally, it analyses the problems in the project progress and provides the corresponding solving measure. The writer made a sum-up and proposal and the problems need to be settled at the end of text and hope the text can provides reference for similar projects in some degree.
Keywords/Search Tags:Project Management, Schedule, Cost, Plan, Control
PDF Full Text Request
Related items