Font Size: a A A

Research On Cost Management Of A Farmland Water Conservancy Construction Project

Posted on:2022-05-22Degree:MasterType:Thesis
Country:ChinaCandidate:J Z LvFull Text:PDF
GTID:2492306566484774Subject:Project management
Abstract/Summary:PDF Full Text Request
As the infrastructure of farmland water conservancy,farmland water conservancy projects play an important role in ensuring national food security and promoting agricultural modernization.They have large investment amounts,long payback periods,emphasis on public welfare,regional,large impact by natural conditions,and diversified engineering forms.characteristic.Since farmland water conservancy projects involve government investment,it is necessary to conduct comprehensive performance evaluation of the project and continuously reduce the bidding price.In the face of fierce industry competition,in order to win the bid,the company will lower its bid price as much as possible.The combined effect of the two leads to the continuous reduction of project profits.In addition,due to market influence,the use of manpower,materials,and machinery has increased year by year,causing the company Increased production costs.Based on the dual pressure of the low bid price and the continuous increase of the construction cost of the enterprise,under the premise of meeting the quality requirements and schedule,in order to maximize the benefits of the enterprise,the effectiveness of cost management and the improvement of the enterprise management system are the basis for the enterprise in the fierce competition fundamental.This article introduces the importance of farmland water conservancy,and expounds the background,significance,methods of cost management research,as well as domestic and foreign cost management theoretical research and related concepts and theories.After theoretical analysis,the thesis combines A farmland water conservancy construction project to introduce the project’s overview,cost management objectives,characteristics,etc.in detail.According to the actual characteristics of the project,the cost deviation method and the earned value method were used to analyze the cost management of the A farmland water conservancy construction project in the planning phase and the project implementation phase.Through the analysis of the deviation between the project’s plan,budget,and actual cost,find out the project’s problems in cost budget,actual cost control,and project schedule control,and take timely and effective improvement measures to ensure that the company is in the subsequent construction The cost is controlled within a reasonable range.The purpose of this paper is to analyze the case of the farmland water conservancy construction project and study the corresponding cost management methods,and point out that the same project can use different cost management methods for cost management according to the actual situation of the project and the characteristics of each stage.The organic combination of the two can find out the problems in the project implementation process in real time and adjust the cost management measures at any time to achieve the purpose of effective and economic management of the project,so that the enterprise can complete the project with low cost and high quality,and enhance the overall competitiveness of the enterprise.In the future,the cost management of related projects will provide powerful reference opinions.
Keywords/Search Tags:irrigation and water conservancy project, Cost management, Earned value analysis, deviation
PDF Full Text Request
Related items