At present,China’s rapid economic development is in the stage of rapid development of urbanization,and urban functions are also changing.The transformation of urbanization and urban functions is bound to be accompanied by urban expansion and rapid renewal,which brings huge There are both old industrial building renovation markets.Existing old industrial building renovation projects are different from conventional new projects.Due to their particularity and complexity,they pose greater challenges to the quality of construction projects.According to the literature research and engineering project research on the old industrial building renovation project,the design quality of the old industrial building renovation project has become the important factors affecting the quality of the project.However,there are few studies on the design quality management of existing old industrial building renovation projects.The research on quality management mainly focuses on the construction quality management of new buildings.Therefore,researching the current status of design quality management of old industrial building renovation projects and improving the design quality management level of existing old industrial building renovation projects should be the focus of the design industry.This paper basing quality management theory adopts expert interviews and questionnaire surveys and the analytic hierarchy process,studies the design quality management of the 898 renovation project at various stages of design based on design company.Firstly,it analyzes the research status of quality management and design quality management about relevant areas at home and abroad,and studies the relevant theoretical basis of the quality management and the design quality management.Secondly,the overview and characteristics of the design quality management of the898 renovation project are first described,the external problems encountered during the design in the quality management of the 898 renovation project and the existing problems were analyzed,and the application of PDCA management method in the design quality improvement of 898 retrofit project was also analyzed.Thirdly,through expert interviews and questionnaire surveys,the problems existing in the design and quality management of 898 renovation projects were summarized and analyzed by the analytic hierarchy process.Fourthly,through analysis and research on design quality management at home and abroad through German Ruhr Industrial Zone Reconstruction Project and Shanghai Contemporary Art Museum Reconstruction Project,the relevant experience is summarized,and the scope of use of such experience and the matching in the design quality management of 898 project are made.Degrees were analyzed.Finally,the improvement strategy of 898 renovation project design quality management is proposed,from Reduce policy risk and economic risk,organize and build excellent design management team,cooperate with excellent art design team,improve creative design level,ensure design quality safety and fire safety,improve quality responsibility system and evaluation system and introduce BIM technology to enhance design quality Management six aspects Improvements have been made to provide a reference for similar projects. |