| In a music school building renovation project quality management in the process,the project itself has a life cycle long,difficult,how wide,participation,scale etc,so this kind of quality management of construction project is a complicated,complex and tough job.An institute of music as the owner of the project,is also the responsibility of the project main body and total investors,for the quality control of the weight of the core,its about the quality of the project management involves every part of the project and at various stages.Therefore,it is the main research purpose of this thesis to adopt effective management measures and methods to improve the quality management and control of the project.Study the core of this thesis is a conservatory of music what good quality management and control strategy of renovation project implement,so in the domestic and foreign research present situation and the project quality management theory as the research foundation,this thesis expounds the concept and characteristics of project quality,sums up the connotation of the quality management and the specific principle,to a conservatory of music in the renovation project quality management responsibilities and tasks to be clear,and combines a unique characteristic of music school renovation project to the actual project implementation process,for a certain conservatory of music teaching building renovation project focuses on the stages in the analysis,summed up a conservatory of music in the problems of quality management.Combine quantitative and qualitative to the project quality management,find out the specific solution and implementation measures,and make the whole process of management strategy,namely "quality management is the core of the owner,is closely related to the early decision to the success of the project,the soul of the quality management is the design phase,through micro supervision and macro control,strengthening coordination and communication to complete the construction,at the same time using comprehensive evaluation method of optimum construction".This thesis puts forward the extension of the extension of the concept of supervision,the extension of the scope of research,the application of the three-party property management idea and the transformation of the research object Angle,and the quality of the quality assurance period is supervised by these innovative ideas.In the process of further improvement,we will start from the aspects of quality supervision,quality information,coordination mechanism and standard system,so as to ensure that the renovation project of the teaching building of conservatory of music can achieve the goal as scheduled.In this thesis,through researching a conservatory of music teaching building project quality control,the proposed control method of a music school building renovation project of the implementation of the quality control have high guidance,provides the decision-making basis for project managers is very reliable,at the same time,the school of music teaching building renovation project implementation plan of the project,is based on the optimization from the Angle of cost and benefit,therefore,not only has good economic benefits,at the same time can also promote the development of local education level and economic level.The optimization in the aspect of quality control on the building renovation project and other similar project can provide reference component. |