Font Size: a A A

Research On Quality Control Content And Method Of Post-Disaster Housing Reconstruction Project In A Town Of Qionglai City

Posted on:2022-07-29Degree:MasterType:Thesis
Country:ChinaCandidate:C HuoFull Text:PDF
GTID:2492306521480074Subject:Project management
Abstract/Summary:PDF Full Text Request
After the "4.20" Lushan earthquake in 2013,Qionglai City,Chengdu,Sichuan Province was seriously affected.How to do a good job in the post-disaster recovery and reconstruction is particularly important and urgent.Qionglai city plans to invest 13.58 billion yuan to implement 194 reconstruction projects.The quality of post-disaster housing reconstruction project is affected by many uncertain factors,such as a variety of raw materials,products,quality is difficult to fully control,etc.,how to use scientific methods to achieve scientific control of project quality is particularly critical.In this context,based on collecting data,reading documentary materials,inducing and analyzing what he has learned,the author dissects the possibility of controlling the quality of post-disaster housing reconstruction project in A town of Qionglai,and brings up the relative measures,which are of great importance to improve the management level’s quality of post-disaster housing reconstruction project in A town of Qionglai city and help the people recover their production and life in the disaster area as soon as possible.It is also of great significance for the quality control of other post-disaster housing reconstruction projects.It is found that for the post disaster housing reconstruction project in A town of Qionglai City,it has its distinctive aims and tasks during each period,in the planning one,the aim of the project’s quality is confirmed and the relative planning books are worked out with the purpose of making up the complete system to guarantee the whole quality of the project;In the control stage,the 24 whole project(including before,during and after the construction)implementation process is determined in an all-round way;In the inspection stage,the good institution of inspecting and checking is established to ensure the successful actualizing of the project;In the problem-handling stage,nearly all possible problems have been predicted,analyzed and solved,as a result,the management system of the project quality has been optimized.
Keywords/Search Tags:Post-disaster housing reconstruction project, quality control, case analysis, Lushan earthquake
PDF Full Text Request
Related items