Font Size: a A A

A Study On Cost Management And Control Method Of Post-disaster Reconstruction Project

Posted on:2014-07-08Degree:MasterType:Thesis
Country:ChinaCandidate:H M ZhangFull Text:PDF
GTID:2272330434952205Subject:Project management
Abstract/Summary:PDF Full Text Request
The management of post-disaster reconstruction is an integrated discipline of politics,economy,technology and management. How to make good use of post-disaster reconstruction funds and achieve the goal of post-disaster reconstruction is the category of project cost management. Therefore cost management is an integral part of the management of post-disaster reconstruction. The level of the project cost reflects the national concern, local implementation, work quality and management level of the construction unit.The method study of the projects of post-disaster reconstruction provides a perfect theoretical basis for post-disaster reconstruction. However,at home and aboard, post-disaster emergency management theory and project management focus on planning and the system of reconstruction, as well as the general research in a non specific process of project management. There is not a systemic research of cost control of post-disaster reconstruction.In the goal control of post-disaster reconstruction, there is a division of total investment in the planning of the reconstruction of post-disaster reconstruction project. However in the implementation of the reconstruction process, because of the imbalance of change range of the cost of rebuilding constitute artificial, material (equipment), machinery and management, and the different kinds of uncertain factors of the region and environment of reconstruction, the difficulty of reconstruction project cost control increases abnormally, the investment there turns to be different degree of overweight or out of control.Through the decomposition of the impact factors of the cost of reconstruction of the Wenchuan earthquake-stricken areas, the paper has carefully analysised of composition of the project cost, and systematically summarized methods of post-disaster reconstruction project cost calculation and control,Combining with social human, life, material cost changes and cost adjustment range during the reconstruction. Making full use of project cost management theory in the management of post-disaster reconstruction, meantime,according to the special requirements of post-disaster reconstruction, innovating and developing the project cost management, expanding the project funds management and extending the cost control, trying to put forward the reconstruction project funds management and methods of project cost control is the main purse and meaning.
Keywords/Search Tags:emergency management, post-disaster reconstruction, projectmanagement, cost management, cost control
PDF Full Text Request
Related items