Study On The Optimization Of C Platform Automation Control Project Progress Schedule Management In S Institute Base On MS Project Software

Posted on:2010-05-05Degree:MasterType:Thesis
Country:ChinaCandidate:S ShaFull Text:PDF
GTID:2178360275496194Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In recent years, the international high-end projects laboratory experiment platform is becoming increasingly fierce, in a wide range of consideration in S institute by the General to proceed with a similar experimental platform C construction. The experiment platform of experience in project construction and methods of the current gap, but in the construction of the platform used in the traditional management tools are not use a variety of valuable resources to take full advantage of the project, so the experiment platform for the C of sub-projects that: C platform automation and control projects, their progress and optimization of an in-depth study, I hope in the progress of the project can be drawn to optimize the process of experience and methods, and similar to the experimental platform for the future to provide some construction experience and can be used as reference method.This paper described the theory of project management and project management theory and methods firstly, introduction of the required text used in MS Project management software, then the S and C research project management system platform and the platform one by one automation project in detail introduction, followed by the use of MS Project management software, deal with "S of the C platform of automation and control projects" for the overall decomposition of the WBS in the decomposition of the project after the automation and control to identify the critical path, made and summed up the show by one of the a variety of typical problems; then based on the analysis of these issues raised platform automation project ideas and methods of optimization, followed by the application of the proposed ideas and methods to optimize automation and control projects for the progress of optimization, optimized at the give job summary and detailed project WBS decomposition; Optimize before and after the last of the C platform automation and control project carried out a detailed comparison, the contrast is mainly from the project construction, project network diagram, project personnel, as well as the optimization of the new part of this after a few were carried out, at one of the project personnel to optimize pre-and post-contrast give a detailed numerical analysis. Finally come to the C platform optimized automation and control projects to reduce significantly the period is feasible, after the progress of scientific research on the impact of the two most important aspects, that is, research questions and research plans for the personnel management issues analysis must, give a number of their own views and opinions; Finally Looking at part of the thesis analyzed the C platform for the construction of the project flow, the proposed development and the establishment of a web-based so as to form a platform for the management of the main project management system and platform for the project through the more important test equipment power flow of a detailed analysis shows that to form such kind of web-based management system implementation must provide a realistic basis.This thesis used a combination of theory and practice of the method to the management of major software applications and management practices in the use of traditional management methods of research in regard to scientific research institutes to enhance the background of the experimental platform for cutting-edge projects for the construction of the reference value.
Keywords/Search Tags:Progress management, MS Project software, WBS, Form management
PDF Full Text Request
Related items