The Design And Implementation Of Engineering Control System For Weihai Power Supply Company

Posted on:2019-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:C L FanFull Text:PDF
GTID:2428330542496811Subject:Software engineering
Abstract/Summary:PDF Full Text Request
The power engineering projects Weihai Power Company is facing are becoming larger and more extensive.As a result,the maintenance work of the project in the day-to-day management and control of the power companies is becoming more complicated,the projects are gradually increasing,and the construction period has been decreasing,resulting in the phenomenon of out-of-control construction projects became more and more serious.Weihai Electric Power Company has had more risks and troubles in engineering control.Therefore,how can Weihai Power Supply Company solve the daily control and comprehensive inquiries of the project and how to reasonably reduce all kinds of problems in the implementation phase of the project have become an urgent problem for the management and control department of Weihai Power Supply Company.Weihai Power Supply Engineering Control System is designed and implemented against the current background.The engineering management and control system is based on the Broswer/Server architecture and uses a server-side database to organize data.It implements hierarchical,distributed,and classified management of information through computer networks to ensure consistency and maintainability of information data.The system adopts Asp.NET architecture,uses C#technology and middleware technology to implement,and supports a variety of popular server hardware and software platforms.Adopt XML international standard as the data exchange interface specification,have good openness,fully consider the vertical and horizontal function expansion and application system integration in the future.The engineering control system can realize the four major functions of project maintenance,engineering project management and control,comprehensive inquiry and system management.The main operations that can be implemented in the project maintenance are project category maintenance and project plan maintenance.The project management and control are used to implement project milestone plan management and control,project site progress control,on-site fund management and control,project contract information management and control,and engineering coordination meeting minutes management and control and other operations.The comprehensive inquiry is used to implement project information query,project plan inquiry,project site progress inquiry,project fund status inquiry,project coordination meeting minutes summary,and project status overview.The main operations that can be implemented in system management are department maintenance,job maintenance,user maintenance,job position setting,job permission setting,and job project permission setting.The application of the system is applicable to all aspects of project management and control of Weihai Power Supply Company.After the operation,the project fund settlement and on-site construction progress can be reasonably combined and mutually restricted,and the image directly reflects all the progress of Weihai Power Supply Company's project,giving the company leader a reliable performance of management decision-making materials,reasonably reduce project implementation risk.
Keywords/Search Tags:Engineering control, Engineering project maintenance, On-site capital control, Asp.NET, C#
PDF Full Text Request
Related items