Font Size: a A A

Design And Implementation Of Anlan Company Engineering Project Expense Management System

Posted on:2017-09-11Degree:MasterType:Thesis
Country:ChinaCandidate:W ShiFull Text:PDF
GTID:2348330488958408Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Anlan company’s project expense management system is constructed with focuses on carrying out new management pattern and meeting the company’s long-term business development objectives. With respect to business functions, this information system is developed with the requirements based on the company’s project-centric management pattern and new demands from business flow re-procedure on the enterprise group scale. With respects to the business ranges, this system is built with the integration of complete project expense management transaction flows and data processing functions within an uniform framework.This software’s implemented functional modules include those of the engineering projects’ daily expense transaction processing, general ledger accounts setup and transfer processing, account balance management, business verification management, voucher management and capital flow information management functions. On the software technology layer, the system is constructed with current mainstream distributed application development methods and tools to implement a software system with reusable components. The system’s development is based on the enterprise’s business demands with reasonable balance between technical advantages and practicability to build the stable and reliable software platform. In accordance with the above guidance, the thesis systematically discusses the main aspects in this software design and implementation.This software uses the Web centric distributed architecture with the front end of universal browsers and the back end of database platform on which to implement the project expense transaction processing and data management mechanisms. The software runs in Windows/.NET environment and is programmed with C# and SQL Server database routines. It is under the test running with positive feedback from the users and reaches its development objectives in a good degree.
Keywords/Search Tags:Expense Engineering Management, Project Management, Capital Flow Management, Management Information System
PDF Full Text Request
Related items