In response to the issue of old-age care,Premier Li Keqiang pointed out that actively promoting the combination of medical care and maintenance is the main means to cope with the aging of the population and strengthen the protection of people’s livelihood.Because the combination of medical and health PPP projects is an emerging model for the combination of medical and nursing projects,at the same time,has the characteristics of large investment,long construction period,long investment recovery period and many participants.The risks are more and more complicated.How to effectively carry out the risk management of PPP projects is the key to the success of the project.Based on the three risk management perspectives of macro,meso and micro,the risk evaluation index system of medical insurance combined with PPP project was constructed,and the risk evaluation model of medical combined with PPP project based on entropy weight fuzzy comprehensive analysis method was established.The medical care combined with the risk sharing plan and specific process of the PPP project,combined with the case analysis of the Heze M project,verified the validity of the model.Based on the risk assessment and analysis of M project in Heze City,the operational risk of M project in Heze City has the greatest impact on the whole PPP project,followed by engineering design risk,economic risk,construction risk,cooperative relationship risk,natural risk and policy risk..Finally,the combination of qualitative and quantitative methods is used to analyze the influencing factors involved in the risk management of medical and PPP projects,construct an effective risk sharing mechanism,and provide corresponding risk management for medical and PPP projects.Control measures. |