The Research Of Management Of Epc Engineering Design On Project Of S Company

Posted on:2020-08-04Degree:MasterType:Thesis
Country:ChinaCandidate:H J HuangFull Text:PDF
GTID:2392330623961858Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of the international power construction market,advanced technologies such as precision,modularization,and three-dimensional design have gradually become mainstream.Whether the design management of S Company can keep pace with the times is related to whether S Company can maintain the EPC market in the international power station.leading position.It is extremely urgent for S Company to sort out and update a set of design management methods applicable to EPC projects.It is necessary to review the existing design management system of S Company based on the problems encountered in the EPC contracting process of S Company,and the problems in the management of S Company.Make corrections to supplement the missing links.Based on the current situation and problems of design management of S company,gradually refine and supplement the design management system of S company,and strive to achieve the goal of “fine design,close cooperation,full participation”,which can be started from the following aspects: decision on implementing bidding project And screening,to eliminate the phenomenon of rushing work,put manpower and time on more confident and valuable projects;carry out risk identification of bidding projects,cause EPC designers to pay attention to potential risk factors,try to achieve risk avoidance,And design the response to risk,minimize the negative impact of risk on the project;popularize the use of Divisionof Responsibility(DoR)division of labor,so that projects with collaborative design,design both sides to display expertise,and closely cooperate in the design process;Design document management file system and codingsystem to ensure that documents are organized and easy to retrieve and access;establish a joint design platform,use(Plant Design Management System)factory 3D design management system to achieve real-time collaborative design;strengthen cooperation in design and procurement To involve the design in the procurement contract Set the design representative of the permanent site on site,so that the construction department can better understand the design intent,accurately construct the map according to the drawings,avoid rework;sort out the design change management process,and ensure that the project department and the design institute are fully and timely.Communicate,constrain the internal approval of changes,and promote the progress of approval of changes.In order to verify the design management optimization in the S company EPC project is appropriate,to improve the design management process of the company’s EPC project,the design management optimization measures are implemented in the company’s first EPC project to verify the operation.In practice,it is found that the decision-making,screening and diversion of the project have a significant improvement effect on the process management and quality improvement of S company design management;the organization design department carries out risk identification,because the designer himself considers part of the nature and technology based on his own experience.Risk factors,the original control effect is better in the amount of engineering,the improvement effect is not obvious;the DoR division table used in conjunction with other design units is gradually popularized,and the design management personnel generally pay more attention to the work of the organization engineers to audit the DoR division table.The 3D design platform is gradually applied in all of the S company’s international power station EPC projects,increasing the efficiency of its own collision detection,and also improving the speed of design communication in the joint design.In general,the improvement of the design management process has played a positive role in the design process of the S company’s solar thermal project.The advancement of design management methods and the advancement of design technology are inseparable from the accumulation of project experience.The advancement of design technology has greatly improved the efficiency of designmanagement in recent years.Through the practice and optimization of the design management work in the L project,we will promote the effective measures and experience in other projects of S Company,and also design the domestic EPC general contracting enterprises in the implementation process of the international EPC project.Management work provides positive impact and reference.
Keywords/Search Tags:EPC project, construction project, design management, design change
PDF Full Text Request
Related items