Progress Management Of Architectural Design In Qingdao LS Residential Quarter

Posted on:2021-02-11Degree:MasterType:Thesis
Country:ChinaCandidate:W Z XuFull Text:PDF
GTID:2392330611992333Subject:Project management
Abstract/Summary:PDF Full Text Request
Since the 21st century,the real estate industry has gradually become a pillar industry for the development of the national economy.In recent years,real estate development has gradually become rational with the regulation of national policies.In the past,the rough development model has ceased to exist.Instead,it has been carefully crafted for housing,public construction and other products,and the cost,quality and construction period are almost strict.Demanding.In this context,architectural design companies have gradually exposed many problems.The competition between architectural design companies has intensified,and the design fees have become lower and lower;the owners have put forward higher and higher requirements for architectural design products,and the design costs have increased year by year;due to the lack of engineering management awareness,the internal consumption of the design companies has been serious...Architectural design The company has reached a moment of urgent change.Architectural design provides a blueprint for the specific implementation of construction projects and is the main basis for subsequent construction,cost control,procurement and other work.The quality of architectural design depends not only on the professionalism of various professional architectural designers,but also on architectural design The company's engineering management capabilities.Unfortunately,at this stage,the management level and management experience of my country's survey and design industry lags significantly behind developed countries,and also lags behind domestic bidding,construction and cost consulting industries.The use of modern management theory,combined with previous architectural design experience,to sum up a project management model suitable for architectural design companies,has become the focus of the design company's next step.In order to solve the problems in the project progress management of architectural design enterprises,this paper starts from the existing progress management tools of the ZHLS Group Design and Research Institute and finds out the problems in the project progress planning and control of the existing architectural construction drawing design projects.Work decomposition is applied to the construction drawing design of the building project,decomposing the design tasks into controllable work packages,formulating the network plan of the construction drawing design stage of the building project,looking for constraints,introducing buffer areas,improving the design process,and then building the project The key chain technology is introduced in the design stage of construction drawings,and the actual experience of the project is combined with the theory of progress management knowledge for research.This article systematically introduces the basic ideas and procedures of the key chain technology.Taking Qingdao LS residential district as an example,it specifically studies the application method of the actual architectural engineering design project based on the key chain theory,focusing on the architectural design project progress and architectural design projects.The application of progress control is aimed at shortening the project cycle,controlling the project progress,and avoiding the impact of unexpected factors on the construction progress of the construction project,so as to ensure the completion of the project on time.This paper makes some exploratory research on the application of the key chain method in the actual construction engineering design project,hoping to provide some reference experience for the construction design progress management of the same type of project.
Keywords/Search Tags:Architectural Design, Progress plan, Progress control, Key Chain
PDF Full Text Request
Related items