Font Size: a A A

Research On Risk Management Of Mobile Broadband Access Project In Huayuan New Area

Posted on:2021-02-23Degree:MasterType:Thesis
Country:ChinaCandidate:W F DuFull Text:PDF
GTID:2392330605473189Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
With the construction of 5G network base station and the formal business gradually on the right track,various services based on broadband optical fiber gradually become the new growth point of mobile communication operators' income.If China Mobile wants to rapidly occupy the market share of home broadband in the fierce market competition,it needs to realize the comprehensive coverage of cities and towns,and the coverage of rural areas according to the demand.In the current environment,the demand for new users of home broadband is growing rapidly.In view of this,it is necessary to complete the full coverage of the urban community as soon as possible,actively communicate and coordinate the settlement of the completed community,and communicate with the builders in the early stage of the new community construction to avoid the subsequent access difficulties.Huayuan new area is a newly built community in Chengzihe District of Jixi City.Jixi City is located in the easternmost part of Heilongjiang Province,with long winter and short summer,and the construction time is greatly reduced.Due to the special environmental factors in Jixi City,the construction period is short and the task is heavy,which may lead to the lack of understanding of project risk.In order to ensure the completion of the project on time without delay,reasonably avoid the possible risks and do a good job in response,and complete the full coverage of China Mobile urban broadband,it is necessary to do a good job in advance in all the preparatory work of the project.This paper takes the broadband access project of Huayuan new area as the research object,starting with the basic situation of the broadband access project under Jixi mobile branch,analyzes the main ways and overall process of broadband access in the community,designs the identification method and process of the broadband access project of Huayuan new area,and analyzes the possible ten kinds of projects in the access construction process from three dimensions of economy,technology and management Second level risk factors are identified.On this basis,the expert scoring method,AHP and fuzzy comprehensive evaluation method are used to build the risk evaluation index system of broadband access project,establish the risk evaluation model of broadband access project,calculate the weight of risk factors,measure the overall risk level of the project according to the fuzzy comprehensive evaluation method,and then propose the targeted risk control method of broadband access project Combined with the control methods of various risk factors,the corresponding risk response measures are formulated to provide theoretical basis for the successful completion of community broadband access projects,and provide reference and reference for similar construction projects in other regions.
Keywords/Search Tags:Broadband construction project, Risk identification, AHP, Risk response
PDF Full Text Request
Related items