Font Size: a A A

The Multi-project Plan Management Study And Application For Electric Power Construction Enterprise Based On The Critical Chain

Posted on:2018-11-08Degree:MasterType:Thesis
Country:ChinaCandidate:L HuangFull Text:PDF
GTID:2392330596988771Subject:Project management
Abstract/Summary:PDF Full Text Request
With the increasingly fierce market competition,the number of projects undertaken by electric construction enterprises increases exponentially and the scale expands continuously to realize the bigger and stronger enterprises.However,the contradiction is that the number of core technical personnel in most enterprises is decreasing year by year.In such an industry context,for large power construction enterprises in the internal multi project schedule management requirements are also getting higher and higher.Through the domestic and foreign research on the multi project management category of new progress,new achievements of research and analysis,understand the enterprise multi project management resource conflict causes analysis.Management method of multi project resource management optimization at home and abroad for study,the construction of electric power construction project management strategy of multi project portfolio management,project management,project group project implementation three level model level management.At the same time,aiming at the problem of increasingly comprehensive utilization of human resources in electric power construction enterprises,this paper puts forward the construction project management method based on critical chain technology.This method is also applicable to the optimization of other resource conflicts in multi project groups.In the case of H company at present project management mode of operation of the quantitative analysis,the actual data into the model and combined with the great opportunity for reform of H company actual development strategy and the recent supply side,to a certain extent to solve the multi project human resources for transport conflict situation,help in the enterprise in the limited human resources as much as possible to improve the using efficiency,so as to realize the maximization of the interests between the project group,achieve the purpose of lowering the efficiency.
Keywords/Search Tags:multi project planning management, project portfolio management, critical chain, resource optimization, electric power construction enterprise
PDF Full Text Request
Related items