Research On Project Risk Managementof Landscape And Forestry Department

Posted on:2018-01-04Degree:MasterType:Thesis
Country:ChinaCandidate:W XieFull Text:PDF
GTID:2382330566987890Subject:Project management
Abstract/Summary:PDF Full Text Request
As the construction department,the Landscaping administration is responsible for the success or failure of the landscaping project.The project management department of garden greening project,through investigation from the stages of design,bidding,construction,acceptance review,later management,relates to the superior department,parallel department,survey and design units,construction units,supervision units,public and other relevant stakeholders,full with various risk factors.The success or failure of a project is largely determined by the management of risk.For the first time in this paper starting from the perspective of landscape greening the competent authorities,try through the identification,carding and evaluation related risk factors of the project life-cycle,put forward the corresponding control measures and disposal,provide theoretical basis and practical guide for the Landscaping Department in charge of project risk management.This paper through the extensive literature,questionnaire survey,interviews,landscaping and related fields of experts,leaders and colleagues,and in the light of its own landscaping work experience of project management,set up a list of landscaping project risk factors,finally summed up the list of garden greening projects a total of 26 risk factors.Through the questionnaire survey scoring,evaluation and analysis of the risk factors,according to the score order,the risk factors were ranked according to their importance,which ranked in the top ten of the risk followed by the project approval time is too long,not timely payment for the project "," tender long period "," leadership idea change "and" the maintenance of management is not in place,the construction personnel business level is not high "and" irresponsible supervision "and" investigation Omissions "," preliminary design is too rough,investment budget preparation is not accurate ".This is in conformity with the problems existing in the practical work of the landscaping project management.According to the ten major risk factors,then puts forward the corresponding risk disposal measures are as follows: " project approval time " recommended to take measures to avoid risk," not timely payment for the project "recommended risk control,risk prevention measures," leadership idea change "recommended " measures of risk transfer,maintenance management is not in place "recommended risk control,risk transfer,risk prevention measures or their combination," the tender period is too long,the construction personnel business level is not high "," supervision and irresponsible "," preliminary design is too rough " recommended risk control,risk transfer measures,the survey work Omissions "," investment budget is not accurate enough." Take the risk aversion,risk control,risk transfer measures or their combination.Based on the analysis of risk factors,the risk measures of landscaping projects are put forward.Finally encountered city waterfront park project management problems and solutions,and risk disposal measures with the investigation were compared and verified to illustrate the feasibility of the risk measures,necessity and Landscaping Department to implement the project risk management.
Keywords/Search Tags:landscaping project, risk management, department
PDF Full Text Request
Related items