Font Size: a A A

Research On Yingkou Gold Mine Production Schedule Optimization

Posted on:2018-12-09Degree:MasterType:Thesis
Country:ChinaCandidate:J G WangFull Text:PDF
GTID:2359330542453730Subject:Engineering
Abstract/Summary:PDF Full Text Request
At present,the mining enterprises of basic faces two big problems,firstly,the existing ore production has been unable to meet the demand of economic development.Secondly,the phenomenon of ore import has also led to the increasing competition environment of the ore enterprises.In addition,the enterprise itself has many problems.For mining enterprise,the enterprise internal belongs to a huge system engineering,mine production process is very complex,and the process is various,according to the general project plan the production schedule according to can't meet the requirements of mining enterprises,more can't guarantee the normal and stable development of enterprises.In the current fierce market competition environment,enterprises need to improve the production management process and production control ability of enterprises in order to achieve sustainable and sustainable development.Therefore,it is necessary to introduce the management method of the production schedule to the mining enterprises,so as to ensure the smooth operation of the production by scientific management methods.This project takes yingkou gold company as an example to discuss.Combination of yingkou city gold company for mine production schedule optimization research,the scheme is verified by implementing the scientific nature and rationality,to yingkou city gold company provides scientific,streamline mine production schedule optimization scheme and system.(1)The background and theoretical research: the research background and significance of topic research,through access to domestic and foreign data see certain enlightenment,and in combination with the practical situation of yingkou environment of mining production,make the research content,and focus on the production management,process management and production planning process management related theory.(2)The present situation and problem analysis,the research object of the project is analyzed comprehensively,such as the basic situation of yingkou gold company,the current management of mine production management and schedule plan management,and the characteristics of mining process.At last,the problems and causes of the problems caused by the mine production schedule are put forward.(3)Production schedule optimization design,first of all,this paper discusses the characteristics of mine enterprise production schedule,objectives and structure,and then to the target design corresponding schedule optimization scheme,such as mine production planning optimization,the mine resources plan design and the optimization of mining engineering buffer.(4)Production schedule implementation plan optimization,using the scientific management method and the implementation of the proposed scheme,the scheme for analysis and evaluation,and formulate the relevant guarantee measures.At present,the traditional method of network planning does not constrain resource allocation.Which leads to the production practice inconsistent with plan,therefore,in HJ company production schedule optimization study of process,not only should consider the relationship between production process flow,also need to consider to allocate resources.Therefore,the plan formulated in this way can be realistic and can effectively manage the progress,as well as provide reliable decision-making basis for managers.
Keywords/Search Tags:Mine production, Schedule, Process optimization
PDF Full Text Request
Related items