Font Size: a A A

Study On The Intensive Construction Of Material Purchasing In M Power Corp

Posted on:2018-09-11Degree:MasterType:Thesis
Country:ChinaCandidate:D H JiaFull Text:PDF
GTID:2359330518458092Subject:Business Administration
Abstract/Summary:PDF Full Text Request
M Power Grid Corp was founded in June 2009,its core business is operating the power grid.M Power Grid Corp set up so late that still exist many weak links in material procurement intensive management,among which the material procurement intensive management system of “level one control,level two operation”,also material management mechanism and more details still need to be further optimized.This article launches the following research of M Power Grid Corp by focusing on deepening the implementation of the material intensification.Firstly,based on the management status of M Power Grid Corp material intensification,compare to advanced supply chain management practice in this stage and analysis its problem in the process of achieving material intensive management.It will afford optimization reference to deepening material intensive management construction in future.Then,based on the development strategy of the group,the paper puts forward the idea,principles and objectives of material intensive management and analysis comprehensively its important notices from many aspects.From the point of ‘Three Intensifications and Five Systems' as a whole,further the research into the coordination and cooperation between material intensive implementation plan and other ‘two Intensifications' and ‘Five Systems'.in-depth analysis the strategic requirements for deepening the material intensive management implementation plan.According to the practical situation of M Power Grid Corp,from the optimization of material supply institutions,standardized material intensive work responsibilities,deepen the material management facilities,optimize material management business process,the construction of scientific and reasonable warehousing and distribution system of M Power Grid Corp to deepen the material intensive management scheme.Finally,the multi dimension security system put forward from organization guarantee,system security,personnel security,security management four aspects,deepen the risk material intensive management program implementation process put forward corresponding preventive measures based on the forecast,in order to improve the efficiency and overall ability of M Power Grid Corp supplies lies supply management service level.
Keywords/Search Tags:M power Grid Corp, Materials purchasing, Intensive, Safeguard measure, Risk prevention
PDF Full Text Request
Related items