Research On S Power Grid Construction Project Early Phase Process Reengineering Based On Lean Management

Posted on:2013-01-18Degree:MasterType:Thesis
Country:ChinaCandidate:Q JinFull Text:PDF
GTID:2359330488484330Subject:Engineering
Abstract/Summary:PDF Full Text Request
Grid power supply is the important carrier,is the basic industry of the national economy and the important public utilities,is beneficial to the people's livelihood,social stability,power grid construction project preparatory work is the premise and foundation of the power grid project success or failure,but company of our country power grid construction in early work still exist in the various defects.So we should consider the application of scientific analysis method and the theory basis,the use of advanced management concepts,find out the transmission project management of premenstrual problems and uncertain factors,to maximize the benefits of project management.This paper takes S power company as a case study,discusses in the power grid construction projects to introduce the concept of lean management,combined with the characteristics of electric power enterprises,and actively and steadily carry out business process reengineering.This paper analyses the power grid construction project characteristics and special requirements,according to S company's power grid construction prophase work status,removed from production,business operations during the waiting process,people or objects such as unreasonable factor analyses and application of lean management to improve the working train of thought,and proposes to strengthen the demand side,prediction the establishment of a comprehensive financial evaluation system,strengthen the risk identification and control,eliminate flow bottleneck,establishing information system and a series of process optimization scheme.Practice has proved,in power grid construction in the early introduction of lean management,for the refinement process management,improve operational efficiency,enhance the performance indicators,enhance employee autonomy and initial effect,to earnestly implement the State Grid Corporation modern strategy goal is of important significance,for other domestic power grid enterprises have certain effect.
Keywords/Search Tags:lean management, power network construction, process reengineering
PDF Full Text Request
Related items