Higher vocational colleges serve for the economic development and provide talents for the society.To cultivate skilled talents of a high level,the development of economic clustering objectively requires the clustering of academic disciplines,professional embedding in industry chain and so on in higher vocational colleges.The successful completion of professional group construction depends on the project schedule management.Optimization of the project schedule and control of project schedule are two critical aspects of the progress of the project management.It is possible to shorten the construction period,save cost and utilize resources effectively by optimizing the construction progress plan.By controlling the construction progress plan,any problem existing can be found and corrected timely to guarantee the anticipated goal's achieving.Take the construction projects of mechanical and electrical professional group in HY University as the research object,first elaborated the thesis topics of research background,research status of this research purpose and meaning and research contents and methods;then describes the theoretical basis of the progress of the project management,in order to lay the groundwork for discussion;once again to do a brief introduction of the construction plan of mechanical and electrical professional group in HY University;subsequently optimize and control the construction projects of mechanical and electrical professional group in HY University schedule and proposed the measure of safeguard in the processof optimization and control.Finally,the main conclusions reveal deficiencies and limitations of this study,the fight can continue to improve in future research and improved to provide better theoretical support and help for the progress of the professional group project management research. |