Font Size: a A A

The Design And Implementation Of Science And Technology Project Management System For Yunnan Light Industry Institute

Posted on:2018-04-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhongFull Text:PDF
GTID:2348330542452160Subject:Software engineering
Abstract/Summary:PDF Full Text Request
There is some problems of Yunnan Light Industry Research Institute about the management process of science and technology projects,such as the traditional paper way of science and technology projects declaration and audit often lead to wrong forms and contents when users registering,so it had to be re-filled,and the audit efficiency is low.Therefore,the construction of science and technology project management system for Yunnan Light Industry Research Institute and the implementation of network information for science and technology projects declaration process,will be able to facilitate the users declare science and technology project,and can greatly improve the efficiency of the audit staff.The main work of the paper included system requirements analysis,system design,system detailed design,implementation and testing.System requirements analysis included an overview of the business requirements of the system,the division of the roles of the system,the analysis of the main business process and data of the system,and the detailed analysis of the functional cases of the six business functions,as well as non-functional requirements analysis.System design mainly confirmed the overall architecture of the system,the technical support architecture of the system,the B/S infrastructure and SSH framework,and designed the function architecture.System detailed design mainly included the detailed design of the six business functions,and the function of the system was analyzed by using the class diagram and the time diagram while the system database was designed.ER diagram and databasetable structure were designed.System implementation and testing included function realization and key point explain of the six business modules,and detailed use case testing and unit testing were used for all function of each business module,while stating the system's test environment.System business can be divided into the following aspects:science and technology project management,science and technology reward management,science and technology work management,production and research docking management,design consulting management and comprehensive query.Science and technology project management business included science and technology project process management,science and technology project application,project acceptance,post-project evaluation.Science and technology reward management business included new science and technology awards,auditing science and technology awards.Science and technology work management business included new science and technology work and auditing science and technology work.Production and research docking management business included science and technology requirements declaration,science and technology requirements audit,achievement transformation declaration and achievement transformation audit.Design consulting management business included design qualification declaration,design qualification audit,consultation qualification declaration and consultation qualification audit.After operation,the system can be completely combined with information management to replace the traditional paper management,and do information management of science and technology projects,effectively improving the efficiency of management work,greatly optimizing the audit process,and realizing real-time and dynamic management of science and technology projects.
Keywords/Search Tags:Science and technology project management, Science and technology reward management, B/S, SSH
PDF Full Text Request
Related items