Font Size: a A A

The Phase Of Project Planning Research To The Small And Medium-sized Water Conservancy And Hydropower Engineering

Posted on:2017-08-03Degree:MasterType:Thesis
Country:ChinaCandidate:J LiFull Text:PDF
GTID:2348330515967163Subject:Software engineering
Abstract/Summary:PDF Full Text Request
In the early 21 st century,Chinese weater conservancy and hydropower development into the peak period of construction.However engineering project construction is involved in the process of technology,economy,organization and management aspects of intricate part of a long process,by many unpredictable conditions control and influence.In order to achieve the goal of construction,the owner of development can adjust the constructionto make the plan objectively,comprehensively and scientifically.Demostic project planning management system research started relatively late,especially from the contractor's project management only used to understand a complete project,a series of problems could trigger a decision.Management of the project owner is more comprehensive,decision-making and coordination process in a wide range of content.From the development of project owners to review the construction scheme of engineering construction it will be a management process more comprehensive,sophisticatedand practical.The author studies the owner party through the optimized construction scheme of project planning,to summarize the owner party planning in the progress of the project management,cost and safety control are important role.According to the study and the practical experience in the work that get a way to the owner of the project planning process.Combined with the software development,aiming at the complex in the process of project planning and has erratically as software requirements in terms of software development,forming a "construction schedule arrangement system" software.As a example,Huangjiazhai implementation stage farewell hydropower station,then,refining methods of planning,construction schedule arrangement system application with specific project,and the optimization results with the actual implementation progress comparison analysis,the analysis results show that the method is scientific and feasible in this paperand the software have developed value.
Keywords/Search Tags:The owner party, Project planning, Software
PDF Full Text Request
Related items