Font Size: a A A

Design And Implementation Of Infrastructure Management And Information System Of Liao Ning Power

Posted on:2016-07-08Degree:MasterType:Thesis
Country:ChinaCandidate:X Y YiFull Text:PDF
GTID:2348330512470925Subject:Software engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of China's power industry and the industry of electric power increases,power system and power grid construction is very important.How to build the information management system meets the needs of the modern construction project,how to improve the efficiency of the management of electric power project construction,it has become the power company is very concerned about the problem.At present,our country is carrying out large-scale power infrastructure construction work,Liaoning electric power company to respond to the call of the country,and actively carry out the construction of infrastructure management and control system.The actual situation of infrastructure management and control system and local project management of state power company on the combination of construction,a construction management information system with the Liaoning power,optimization of construction project management,establish a standardized management system.Construction project management information system construction of the new evaluation standards and management measures are unified,from different extent to enhance the information infrastructure construction and management of Liaoning electric power.This paper is mainly through the study of Liaoning power infrastructure management system present situation and the domestic and foreign references,introduces the significance of the construction management system.The first batch of national key power infrastructure management system construction as a pilot unit,Liaoning electric power company of the system functional requirements analysis and system function design are given focuses on the analysis and elaboration.In the system architecture,the system uses the popular enterprise class J2EE application architecture and Oracle database,and uses the B/S structure,the design and implementation of the module of project management,quality management,safety management,technology management module,and implement the main function module analysis,design and implementation.Finally,by testing the system to verify the feasibility of the system.This system has been through a period of time running and running,the system is running well,no major faults.The system has high performance,improve the functional characteristics.The system for Liaoning electric power capital construction management the efficiency improvement and the State Power Corporation and other provincial network companies power systems infrastructure construction has a very important role.
Keywords/Search Tags:Power Project, J2EE, ORACLE, Infrastructure Management
PDF Full Text Request
Related items