Font Size: a A A

Design And Implementation Of The Project Management System

Posted on:2014-01-06Degree:MasterType:Thesis
Country:ChinaCandidate:J SunFull Text:PDF
GTID:2248330395496762Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Project management is the last century, after the leaves produce a managementtechnique developed abroad. After decades of development, especially after the21stcentury, it has gradually become a cross-discipline, it absorbs systems theory,organizational theory, management science and other fields important research.Previously, the application of project management techniques confined in buildings,industry and other fields in recent years, the field of finance, agriculture, informationindustry, the pharmaceutical industry will also be the introduction of the concept ofproject management which.The project is characterized by small-scale centralized location, single function.Project management is relatively simple, do not need to think too much content, theproject is basically to store paper statements, within the project generally throughface-to-face communication or telephone, text messaging, e-mail communication andcoordination. With the progress of society, the demand is rising, more detailed socialdivision of labor, leading to gradually expand the scale of the project, expanding thescale of the participants, the project management increasingly difficult. Combinedwith the business processes of the project may not centralized distribution, whichbring some challenges to the implementation of the project, there are some obstaclesto participate in the communication between the departments.And in recent years, the rapid development of computer technology and therapidly growing popularity of the Internet, and to provide new solutions for projectmanagement. Construct a strong robustness, high security, cross-platform distributedproject management system. The system is capable of real-time, comprehensivecollection degree of progress of the project, the project team members cancommunicate in real time in order to coordinate their respective progress.Management can also keep control through the project management system projectprogress, identify problems in a timely manner to correct as soon as possible, toprevent the entry appears in the wrong direction, to ensure the project can progress along a predetermined plan.The browser/server (Browse/Server, B/S) architecture model, the advantagesof this mode is that users get rid of the constraints of time, on any networkedcomputer can break the system login through a browser, geographical boundaries toachieve the mobile office, telecommuting dream, quickly and easily completerequirements management, project management, resource management, financialmanagement, and process management. Fully meet the demand for the use of projectmanagement, to improve work efficiency and management level; network resourcescan be fully utilized.Depending on the direction, divided into demand management, projectmanagement, resource management, financial management, process management,collaborative office six functional modules.The main work is to the specific needs of software development projectmanagement, to develop a robust, easy-to-use a secure distributed projectmanagement system, its purpose is to break the geographical boundaries to achievethe mobile office, all participants in the project are timely to communicate with eachother to ensure the smooth implementation of projects.The structure of this paper is organized as follows:First chapter clarifies the background of the project, and in the field of researchprogress, and also gives the design principles of the project, to discuss the need tosolve the problem.The second chapter a brief introduction to the technology used in the project.Including J2EE, Oracle data, SSH, and MVC pattern, focusing clarify the internalmechanism of these technologies, it is the use of these technologies to ensure thesmooth implementation of the application.The third chapter is part of the overall design of the project.Chapter as part of the detailed design of the system.Chapter V full text summary is intended as a general description of theadvantages of the system and the need to further improve the content.
Keywords/Search Tags:J2EE, Oracle, B/S
PDF Full Text Request
Related items