CD Subsystems Mobile Chamber Construction Project Quality And Schedule Management Research

Posted on:2017-06-01Degree:MasterType:Thesis
Country:ChinaCandidate:J HuFull Text:PDF
GTID:2348330512464411Subject:Engineering
Abstract/Summary:PDF Full Text Request
With mobile broadband and the rapid development of mobile broadband, wireless network communication has quietly become a major means of communication in our current society. Indoor distribution system as an important part of the wireless network, its indoor network coverage and capacity increasingly difficult to meet the growing user demand; accelerate the process of improving the quality of indoor distribution network system has become the current communication enterprises to improve customer satisfaction and retention network leading important initiatives.Construction of indoor distribution system is a very complex system engineering, quality management and progress of the entire construction work is particularly important; therefore, based on the actual situation of indoor distribution system construction, the paper selection CD subsystems mobile chamber construction projects research object, its quality and schedule management discussion and analysis, the purpose is to control the situation and protect the realization of project quality control and project progress in the construction of the entire project life cycle, the indoor distribution system for the CD to move this issue undertaken construction project implementation project management suggestions.The full text is divided into six chapters explore and expand the analysis of CD quality mobile subsystems room construction project and schedule management right. First, the paper describes the background and significance of their research and identify the research content, method and framework of the road; then need thesis on the theory of project quality and schedule management were reviewed, but also on the current development of domestic and foreign research a comb; Then, move around the room CD subsystems construction projects before, on the basis of summarizing the status of its project management on the analysis of the project management especially in the presence of quality and schedule management problems and try It proposed the corresponding solution ideas for subsequent in-depth study of the direction. Then the focus of this study, from the CD subsystems construction project quality mobile chamber to start planning, quality management through its critical point analysis, the relevant quality control measures and quality improvement tools; also moving from CD compartment stars implementation process system construction projects and job content, puts forward the corresponding schedule and progress control measures to develop ideas and proposals; final dissertation is the main conclusion drawn from the analysis.Overall, through this paper, CD movement chamber subsystem building research and study project quality and schedule management, so that management CD mobile construction has been significantly improved, but also for the management of other similar projects Practice providing guidance and reference, it has a certain practical significance.
Keywords/Search Tags:Room subsystems, construction, project management, quality management, schedule management
PDF Full Text Request
Related items