Font Size: a A A

Design And Implementation Of Datang International Power Plant Project Prophase Management System

Posted on:2017-12-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y F GuoFull Text:PDF
GTID:2348330488954690Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Prophase management plays an significant function in the overall project, because it is not only relates to various fields and contains lots of different contents and but also boasts a strong and complex performance,so it is works as anchor and description role for construction starting point and ultimate goal in overall project.Owing to neglect the importance of pre-management, pre-construction project management of Datang International Power Plant is still in relatively weak state, which mainly shows in spontaneity, no reasonable standard, low productivity, at the same times, there also exist lot of problems with lasting bad effects. Therefore it is urgent to improve the concept of enterprise management through improving the efficiency of business building by paying more efforts on Prophase management. Research objectives of this paper is to design and fulfill Prophase management system of Datang International Power Plant Project, hoping the system will contribute Datang International Power Plant to achieve the following targets transparency management in management engineering project and its related work; efficiently and orderly conducting the work based on precise rights and obligation of parties involved in related businesses; establishing and improving the risk management system to enhance awareness of corporate risk management and control of the parties, to further ensure the normal operation of the project then to achieve the stated targets of each stage, reaching sound and rapid development of the enterprise, and enhancing the company's operating profit and market competitiveness.Facing the features of prophase management of Datang International Power Plant Project in this paper, the modality of Internet applications Datang International will improve its science and convenience. To surmount instability and operating collapse in the transmission system, the thought pattern and foundation ways of SSI-based systems will be involved. Then, taking advantage of its unique function to enhance the recycle and scalability of the system, further accelerate operating speed of the system. Therefore, this paper requires analyzing the specific circumstance in the process of prophase management in Datang International Power Plant project, as well as similar systems inbound and outbound. Then on the bmasis of domestic successful operating pattern, analyzing the system's demand in thme market to plan the system structure. Finally, analyzing and designing the main function of the whole system based on different aspects of management pattern in fundamental data, execution plan, nature of the work, business discussion, declaration and approval, payment of fees, and fulfillment of reply.After careful detection of the system, each dedicated link for detection should be run to completion. Based on output of the operation, managing in all aspects and the barriers to system operation does not appear. That is, the system operation is normal and smoothly, and it can satisfy the business demands of Datang International Power plant project pre-management system. prophase management of Datang International Power Plant Project explored by this paper boasts unique function in meeting the demands of consumers to construct information system and it also plays an important role in practical application.
Keywords/Search Tags:Power Plant, Project prophase management, J2EE
PDF Full Text Request
Related items