Font Size: a A A

Design Management For Municipal Engineering Of Nanjing Southern New Town

Posted on:2017-05-27Degree:MasterType:Thesis
Country:ChinaCandidate:Z PeiFull Text:PDF
GTID:2322330515985728Subject:Project management
Abstract/Summary:PDF Full Text Request
Along with the development of the urban infrastructure construction,in recent years,Nanjing municipal construction obtained the very big development,at the same time,the municipal engineering design standards and design process and engineering quality requirements are also higher.Municipal road and bridge engineering is a relatively special construction projects,and its comprehensive very strong.However,in the course of the construction of municipal engineering managers and users can't do a good job in the design of the project management unit and the design for the design of forming process to effective management.Should start from the basic construction procedures,to find all the details of management,strengthen the engineering design,this important stage of the design management,to form a complete set of effective management system,to fundamentally solve the problem of municipal engineering design quality.First of all,based on the analysis of the concept and characteristics of municipal engineering and management of municipal engineering design stage,design stage are analyzed,based on the method,this paper introduces several kinds of design management,design management are summarized in primary in some of the basic concepts and theories.Secondly,from the design bidding stage,preliminary design and construction drawing design phase of the three phases of design management method to carry on the analysis and concrete analysis,namely the design bidding stage to establish perfect management system perfect design;The preliminary design stage using systems thinking,value management,interface management,design management method is explained;Construction drawing design phase of the design drawing management,communication management,and design and site construction and management of the three goals of cooperation.Finally,on the basis of municipal engineering project of Nanjing southern new town to do the actual case analysis,further illustrate how to do the design management of owner side,And be able to give Nanjing southern new town and other municipal engineering construction to provide experience for reference..
Keywords/Search Tags:Nanjing southern new town, MunicipalEngineering, Design Stage, DesignManagement
PDF Full Text Request
Related items