Research On The Decorative Project Progress Schedule And Control Of The Biyun Diamond Service Apartment

Posted on:2015-08-16Degree:MasterType:Thesis
Country:ChinaCandidate:Y B XuFull Text:PDF
GTID:2322330512971360Subject:Project management
Abstract/Summary:PDF Full Text Request
Schedule management is one of the core content of project management.Decoration works with many uncertainties,fitting easily lead to actual progress and planned progress of the deviation,which led to changes in schedule planning.Meanwhile,renovation of the extension would have a greater impact on investment,thereby affecting the economic benefits of play.Therefore,the implementation of schedule management and feasible for decoration project is an important issue can not be ignored.In this paper,the actual background of BGXB Company Diamond Court Apartment renovation project,around the decorative project schedule control theory,on the basic of project work breakdown structure and activity time,through project management software tools,the preparation of the total project progress schedule and find the critical path.Combined with the actual needs of the project,on the premise that does not affect the quality of the project,proposed two viable optimization of shorten the critical path activity start time difference and the duration of the compression unit key activities,optimized complete progress schedule of the project.In combination with the actual situation of the project,analysis of the influence of the project progress factors and puts forward the countermeasures in order to ensure that eventually realize the goal of the project progress control.This article based on the BGXB Company Diamond Court Apartment decorative project progress control analysis,relevant theory with the project progress control to provide a progress control plan of the decorative project progress schedule management and an example of optimization and progress control.This article focuses on the theory is applied to study the actual project that trying to learn the project progress schedule control knowledge applied to actual projects.From the conclusion of it,the method proposed in this paper to achieve the desired purpose and hope this article can provide some reference for similar projects for reference value.
Keywords/Search Tags:project progress, progress schedule, progress control
PDF Full Text Request
Related items