Font Size: a A A

Synthesis Of Propylene From Urea Alcoholysis Catalyzed By Hydroxyapatites

Posted on:2017-11-07Degree:MasterType:Thesis
Country:ChinaCandidate:X LiangFull Text:PDF
GTID:2322330512962465Subject:Project management
Abstract/Summary:PDF Full Text Request
China's real estate development industry along with the rapid development of the process of the market economy in China,the rapid development of the real estate industry has not only brought huge profits to developers to promote the growing scale of the real estate business,and also within the real estate industry is becoming increasingly fierce competition,the price of commercial housingin this market environment is constantly pulled.The excessive growth of commercial housing prices beyond the affordability of consumers,a serious impact on the real estate industry.Therefore,in order to promote the health of the real estate industry,the sustained and stable development of commercial housing price control is a very important part.So,effectively reducing the cost of real estate development projects have become a key point of the price control.The article is divided into six parts:The first part is introduction.Mainly reviews the research background,research significance,domestic and foreign real estate project cost control research present situation,research content and research method.The second part explains the related theory of cost control of real estate project.The main part of the project cost control concepts and main theories and methods,constitutes the cost of real estate projects,real estate projects of the difficulty of cost control and cost control of the real estate project.The third part first analyzes the present situation of cost control of A residential project.The author introduces the project general situation,then analysis the project cost control analysis of the status quo,mainly include: the decision-making phase of the project cost control,project bidding stage of cost control,cost control and project audit settlement stage construction phase of the project cost control.Finally,points out the existing problems,such as: project cost control of project cost overruns,delays in project duration,project contract management and project management responsibility system flaw.Analysis of cost control system design of A residential project.This part first explains the project cost control system framework,and then from the decision-making phase of the project cost control,project planning and design stage cost control,cost control and project audit settlement stage project construction stage cost control four aspects to analyze the cost control.Safeguard measure that A residential project cost control.Mainly include: dynamic cost control,strengthening the procurement and contract management,project cost control responsibility system,perfecting the establishment of cost control information system and business ability promotion activities.The fourth part from the cost stage development investment decision,planning control of cost control in design phase,bidding phase of the cost control,construction stage cost control measures and completion cost control measures put forward specific strategies of real estate project cost control.This paper puts forward specific strategies of real estate project cost control.The fifth part is the conclusion and prospect.This part mainly summarizes the research results of this paper,points out the direction of future research.
Keywords/Search Tags:Cost control, Real estate projects, A residential area
PDF Full Text Request
Related items