Research On Cost Control Of Datang Huachuan Wind Farm Construction

Posted on:2017-01-26Degree:MasterType:Thesis
Country:ChinaCandidate:J Z ZouFull Text:PDF
GTID:2322330512457924Subject:Engineering
Abstract/Summary:PDF Full Text Request
Gradually along with the renewable energy, energy problem caused the wide attention of all countries and century. The development of science and technology, the progress of the society, makes wind power as a new alternative to traditional energy,security of energy development and utilization. At present, the number of installed wind reached the scale of the world's first, to reduce the use of non-renewable energy and adjust energy structure in China has played a significant impact.In wind energy to develop at the same time, more and more engineering managers aware of wind power project cost management and cost control has become one of the key factors of wind power project success or failure. Effectively reduce the wind power project cost, reasonable cost control, can enhance the core competitiveness of wind power project construction and enterprise benefit. Therefore,research how to effectively control, wind power project cost is need we delve into the new project.This paper takes Datang Huachuan wind farm project development as the research object, through the analysis of Huachuan project's proposed location, total project construction task quantity and project cost components, the preliminary conclusion can be obtained and the basic situation of the project. Then the paper analyzes the key factors influencing the cost of the project from the diagram of the cost components of the project and the project budget table. In the process of analysis,it is found that the Huachuan project has many problems such as feasibility of development and profit after completion. However, there are many problems in the process of cost control, such as the slow construction time, The project cost of capital problems, there is the tender phase of the project cost of the wind turbine is low, theequipment arrived at the construction site of the timeliness of the problem is very poor, in the construction phase of the project does not start in time caused by electricity price emergency start, development time span High land acquisition costs,poor contract execution and lack of experience in construction site management. To solve these problems, Datang Huachuan wind farm project to consider from the project decision-making stage, the tender phase, one by one to develop the construction phase to solve the cost control program. Finally, this paper puts forward the cost control measures to protect Datang Huachuan wind farm project by focusing on the whole process cost control of project, cultivating and enhancing project cost management and control consciousness, establishing and perfecting project cost management system, and finally achieving the root cause Effectively reduce the project cost of waste, increase the project expected return investment purposes.
Keywords/Search Tags:Wind farm, Project management, Cost control
PDF Full Text Request
Related items