Research On Cost Control Of Datang Fuchuan Wind Farm Construction

Posted on:2017-10-25Degree:MasterType:Thesis
Country:ChinaCandidate:X Q ZhangFull Text:PDF
GTID:2322330512957928Subject:Engineering
Abstract/Summary:PDF Full Text Request
At present, with humanity on coal, oil and other non-renewable petrochemical resources exploitation and more widely, dwindling reserves of fossil resources,environmental pollution problems associated with the increasingly prominent, has become a concern of the whole society. In this case, the development of renewable energy sources more and more attention around the world. Meanwhile, with the advancement of technology, wind power equipment increasingly lower costs, wind energy as a clean, Yun huge amount of renewable energy by governments of all ages,is developing rapidly.The strong support of the state in recent years, the domestic wind power to obtain rapid development, has become the world's first wind power market. 2015, the national new capacity 30753 MW, up 32.6%; total installed capacity 145362 MW, an increase of 26.8% [1]. But with the "Three North" area of ??wind power installed capacity is growing, brownouts abandoned wind situation worse. Southern wind power price is high, close to economically developed areas, limited electricity become increasingly prominent advantages, has become a new competition to the respective wind power investors.The south wind, despite the many advantages, but there are also lower wind speed, poor resources, difficult terrain and shorter construction cycle long rainy season due to unfavorable factors such as the relatively high cost of the construction project. South wind projects in order to achieve profitability, the project is bound to increase the cost of control, in order to increase the operational benefits of the project.Benefits of wind power projects by a factor of three decisions: annual utilization hours, tariff and project cost. In the national tariff policy remains unchanged under the premise of improving project proceeds through the following two methods: First,select the preferred wind good wind resources, increase the fan model and micro-siting preferably optimized, improve the utilization of wind farms hours; the second is for the construction of the project land acquisition in all aspects of civil,electrical and construction management of the implementation of the entire process,all-round optimization, and control project cost.In this paper, a large Tangfu Chuan wind farm project as an example of the construction costs through the main part of the analysis, the cost of the project in the relevant program design, bidding and construction phases of control, and a preliminary discussion of the project organization, personnel deployment and management system and other conditions, to achieve the stated objectives of the project construction cost control for the construction of the south wind low wind speed region offers some useful lessons.Through the project the full range, the whole process of construction cost control,under the premise of ensuring the quality and duration of the project feasibility study and cost reduced compared 31.5733 million yuan, a decline of 7.44%, improve project profitability, achieving the set investment objectives.
Keywords/Search Tags:Wind farm, building project, cost control
PDF Full Text Request
Related items