Font Size: a A A

Research On Liability And Risk Prevention Of Sewage Treatment Plant Bt Project In Yongding County

Posted on:2017-11-10Degree:MasterType:Thesis
Country:ChinaCandidate:Y HuangFull Text:PDF
GTID:2321330536974844Subject:Engineering / Project Management
Abstract/Summary:PDF Full Text Request
BT(Build-Transfer)model is a special new financing construction mode,it started relatively late in our country,and is still in the development stage.This model has a relatively complex subject,which involves the complex structure of infrastructure and environmental projects,high requirement of technical and quality standards,a wide range of terms of the contract,the influence of political,economic,social,legal and natural conditions during the project,the owners,investors and project companies respectively bear different responsibilities,assume different obligations and legal responsibilities.Yongding County as a new planned administrative region of Longyan City,positively respond to Longyan government to enhance the level of environmental protection,improve the living environment for the benefit of the call of the people,vigorously implement the sewage treatment projects.Since BT model faces greater pressure to invest in small towns,the legal system is imperfect,the system is not perfect,the owners,investors and the project companies may face greater legal risk.This paper systematically investigates the legal liability and risk prevention issues in sewage treatment projects,combines with normative theoretical analysis and case studies on the comprehensive and clear analysis of the second sewage treatment plant BT project of Yongding County.Specifically,this paper includes the following 4 sections.Part 1 is Introduction,the background,meaning and other issues of the risk management in the field of urban sewage treatment are discussed,and the research status at home and abroad are summarized.Than the connotation,the legal risk of BT model and relationship between owners,investors and project companies which are involved in the sewage treatment projects are systematic discussed,as well as the legal responsibilities between the three main parties.Part 3 and 4 is the empirical analysis,the legal risks and prevention of the owner,investors and project companies in Yongding sewage treatment project are systematic discussed.In this paper,mainly analyzes from three aspects as the tender,the choice of the investor,the interests of state-owned assets,the legitimacy,buying back and the completion of the project.Since the BT mode faces greater investment pressure in small towns,by analysing the legal risks in small towns,the paper suggests constructing a risk firewall to form a sound system of risk prevention theory in the field of BT model operation.Based upon this paper,it provides some theoretical support and development for the future BT projects in small and medium urban construction.
Keywords/Search Tags:BT model, Three main parties, Legal risks, Prevention
PDF Full Text Request
Related items