The Study Of Risk Management In ZG Gas Transmission Pipeline Engineering EPC Project

Posted on:2017-10-01Degree:MasterType:Thesis
Country:ChinaCandidate:W QinFull Text:PDF
GTID:2311330533950990Subject:Project management
Abstract/Summary:PDF Full Text Request
Long distance Oil and Gas Pipeline Engineering in our country belongs to the strategic energy reserves,which has the characteristics of large investment, high construction technology and management difficulty and relatively short time. Because of it's reduce project uncertainty losses and improve overall project revenue,and Integrate management and control the whole process of risk from the project planning, design, procurement, construction to Final acceptance,on the large project, EPC project risk management has incomparable advantage over traditional project management pattern in our country and it is gradually favored by project owner's large energy the energy industry.The article is based on the theoretical basis of EPC project management and project risk management, and cmbined with the characteristics of the ZG Gas Pipeline Project,which has more uncertainty factors and high project risk,and which is based on the perspective of Risk Thinking, and from the perspective of control the loss of project.Identify all the project risk of EPC Project Department of ZG Gas Pipeline Project, combining with Checklist,Brainstorming, FlowFig; Establish the Risk Index System, Combination with the AHP and Fuzzy Comprehensive Evaluation,Analysis and evaluation risk factors for each item in the overall level of risk of the project,and overall project risk level. Guide the EPC General Contractor develop project risk response measures, preparation of project risk management plan, propose scientific monitoring method.
Keywords/Search Tags:Risk, EPC Project, Project Management, Risk Management, Pipeline Engineering
PDF Full Text Request
Related items