Research On XW Company Management And Control System Development Project Risk Management

Posted on:2018-06-01Degree:MasterType:Thesis
Country:ChinaCandidate:L F HuFull Text:PDF
GTID:2481306047962699Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years,the software industry continues to rise,technology updates rapidly,the project is becoming more and more complex,coupled with customer awareness of the product and requirements are constantly improving,which led to the software development of software enterprises there is a huge risk.In such an era of fierce competition,software enterprises must carry out effective risk management for software projects in order to stand on the market.Software projects need to be constantly changed in the design phase to meet customer needs,which will lead to the emergence of a variety of risks,such as management risk,demand risk,technical risk,etc.,these risks will lead to project failure or delay to pay,etc..Many domestic software enterprises of software project risk management emphasis are not high enough,some software companies although the project risk can be identified effectively,but did not take the corresponding measures for the identified risks,resulting in software product cost rise,postpone delivery;also some software companies to identify the project risk no consciousness,this is the high failure rate of software enterprise software product of the reason,in fact,as long as the software project risk management,risk probability will be greatly reduced,but also reduce the loss,which illustrates the importance of risk management for software project and software enterprise.According to the risk management theory of software project,this paper studies the risk of XW company's management and control system development project.First,introduces the general situation of the business management system development project,then the risk identification of the project,including the management control system task decomposition WBS and risk classification,business management system development project WBS project needs analysis,project design,project development and testing and project management;risk classification from the demand,technology,the process and management of four aspects,finally form a list of business management system development project risk identification.The final project risk list according to the evaluation of the business management system development project,were evaluated from qualitative and quantitative point of two different methods,brainstorming as qualitative analysis methods;AHP as quantitative analysis,two kinds of methods from different angles of the level of risk,qualitative evaluation the risk level is divided into high,medium and low three different levels,the quantitative evaluation are sorted according to the risk weight is calculated,according to the different levels of risk measures and the corresponding risk monitoring,finally using two methods,establish project risk database for the establishment of the project risk and report template in this paper,can be used as a reference to the case of other software enterprises.
Keywords/Search Tags:software project risk management, brainstorming, analytic hierarchy process, risk response, risk monitoring
PDF Full Text Request
Related items